Image provided by: University of Oregon Libraries; Eugene, OR
About The skanner. (Portland, Or.) 1975-2014 | View Entire Issue (March 21, 2018)
March 21, 2018 The Skanner Page 11 Bids & Classified Advertising deadlines 12:00 Noon Monday Hours: Monday - Friday 8:30 a.m. - 5:30 p.m. Review cont’d from pg 6 She doesn’t have to be so poor, given that she’s the only heir to a massive fortune left behind by her parents, Lady and Lord Croft. While her mother is really dead, there’s no proof of her father’s (Dominic West) pass- ing. Lord Croft was an archaeologist/explorer who went missing seven years ago on an expedi- tion to an uncharted spot in the ocean off the coast To place your ad, email advertising@theskanner.com or go to www.TheSkanner.com and click on the “Ads” menu of Japan. He was search- ing for a fabled tomb ru- mored to contain a key to a supernatural realm. Instead of signing dad- dy’s death certificate, ac- cepting her inheritance, and living in the lap of Bids Due: April 4, 2018 by 2PM Bid Documents are available to review and download on Andersen’s Egnyte file. Below is a link to the project documents. Sitework / Site Utilities / Excavation, Steel Package, Elevators Oregon State University Marine Studies Initiative Building 2030 SE Marine Science Drive Newport, OR 97365 Permit Set Documents: https://andersencloud. egnyte.com/fl/24NxYwn8xl The Bid Date Changed. In order to be considered, your bid must be sub- mitted on the bid form provided. Bids are now due on Tuesday, March 27, 2018 by 2PM Project Description: Core and Shell scope for a new surgery/ICU addition consisting of two parking levels, four floors, and a mechanical penthouse. Project Description: The Marine Studies Initiative building is a new state of the art three-story 73,000 SF laboratory facility consisting of research and teaching laboratories, offices, and a 250-person au- ditorium. It is located on the Oregon State University Hatfield Marine Science Center campus in Newport, Oregon. Scope of work included in Pkg. 2: Selective Dem- olition, Misc Concrete, Masonry, Structural and Misc Steel, Steel Stairs, Waterproofing, Metal Panels, Terracotta Panels, Roofing, Fireproofing, Expan- sion Joints, Doors, Frames, Hardware, Curtainwall/ Punched Openings, Skylights, Walls and Ceilings, Painting, Signage, Parking Control Equipment, Fire Suppression, Plumbing, HVAC Systems, Electrical and Low Voltage, and Landscaping. Pre-Bid Meeting (not mandatory): Tuesday, March 20th at 10:00 AM at project site. All request for clarification must be submitted prior to 3/23/18 at 5 pm. Please submit via email to the following: Jerrod Kowalewski jkowalewski@andersen-const.com Tony Carlson – tcarlson@andersen-const.com Submit bids to all of the above contacts via email by 4/4/18 by 2 pm. Instructions for Andersen’s Prequalification Mod- ule are posted on our Egnyte folder. (See address above) All bidders must be prequalified or have submitted their prequalification package prior to submitting a bid. to survive an epic fight to the death with a wor- thy adversary (Walton Goggins) and his gang of goons armed to the teeth. Think “The Da Vinci Code,” with less talk and way more action. Very Good HHH Rated PG-13 for violence and some profanity SUB-BIDS REQUESTED Trafton Creek and Schoolyard Creek Remove Fish Barrier BID PROPOSALS REQUESTED SUB-BIDS REQUESTED Legacy Emanuel Medical Center Pkg. 2: Core & Shell luxury, Lara follows a set of mysterious clues he left behind leading to a an island resembling the Rock of Gibraltar. Upon arriving, she must rely on her wits and her acro- batic and archery skills Documents: 50% CD Package by YGH Architects – Sitework / Excavation / Utilities, Structural Steel, Elevators Bid documents will be available end of day on March 5th, 2018 to review and download from Andersen’s Egnyte site at: 7.01 - 50% CD Package (03-05-18) https://andersencloud.egnyte.com/fl/YD2f1sYcoz *All Wage Rates to be BOLI, January 1, 2018 Contacts: All requests for clarification are to be submitted via email to Kris Anderson kanderson@ andersen-const.com and Chris Reetz creetz@an- dersen-const.com. The cut-off date for all requests for information (RFI’s) shall be Tuesday, March 13th, at 5:00 PM. All bids shall be submitted through email or deliv- ered in a sealed envelope with a flash drive contain- ing electronic documents to the attention of Chris Reetz and Kris Anderson at the following address: Andersen Construction | 6712 North Cutter Circle | Portland, OR 97217 | ATTN: Chris Reetz & Kris Anderson. See e-mail addresses above. Bids Due: April 19, 2018 at 11AM PDT Quotes Due by: April 11, 2018 at 5PM PDT Scope Letter by: April 4, 2018 at 5PM PDT Kiewit is soliciting subcontractor bids and material quotes from subcontractors and suppliers, includ- ing qualified Underutilized Disadvantaged Business Enterprises who meet the criteria outlined in 49 CFR Part 26 and certified by the Washington State Office of Minority and Women’s Business Enterpris- es (OMWBE), for the following project: Trafton Creek and Schoolyard Creek Remove Fish Barrier Owner: Washington State Department of Transportation CONTACT: Chris Parshall 33455 6th Ave South Federal Way, WA 98003 PH: (253) 943-4200 FAX: (253) 943-4201 Email: NW.Estimating@kiewit.com Services and supplies being solicited include: Engi- neering Design Services, Drafting, Aggregate Sup- ply, Asphalt Paving, Cellular Concrete, Civil Work, Clearing & Grubbing, Cold Plane AC, Concrete Barrier, Concrete Precast Materials, Construction Survey, Crane, Electrical, Erosion Control, Environ- mental BMP’s, Fencing, Field Biologist, Fish Exclu- sion, Furnish and Install Rebar, Guardrail, Grading/ Drainage, Landscape Work, Pile Driving, Placing and Pumping Concrete, Potholing, Quality Control/ Quality Assurance, Sawcutting, Shoring Systems, Signing/Striping, Site Restoration, Site Security, Structural Concrete Formwork, Traffic Barrier, Truck- ing, Waterproofing. Conceptual Plans and specifications can be accessed from the WSDOT website at : http://www.wsdot.wa.gov/biz/contaa/Contracts/ Trafton.html 6712 N. Cutter Circle Portland, OR 97217 Phone 503-283-6712 Fax (503) 283-3607 6712 N. Cutter Circle Portland, OR 97217 Phone 503-283-6712 Fax (503) 283-3607 CCB # 63053 CCB # 63053 We are an equal opportunity employer and strongly encourage the participation of emerging small busi- ness, women-owned, disadvantaged, disabled vet- erans and minority enterprises. We are an equal opportunity employer and strongly encourage the participation of emerging small busi- ness, women-owned, disadvantaged, disabled vet- erans and minority enterprises. 3-14,3-21,3-28,4-4-18 3-21-18 The Design-Builder in accordance to Title VI of the Civil Rights Act of 1964, 78 Stat.252, 42 U.S. Code 2000d to 2000d-4, and Title 49 Code of Federal Regulations, Part 21, hereby notifies all bidders that it will affirmatively ensure that in any contract en- tered into pursuant to this advertisement, underuti- lized disadvantaged business enterprises will be af- forded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin and sex in consideration for an award We are an equal opportunity employer. 3-14,3-21,3-28-18 Portland International Airport (PDX) Parking Additions and Consolidated Rental Car Facility (PACR) Portland International Airport (PDX) Parking Additions and Consolidated Rental Car Facility (PACR) HQ Employee Lot & Pedestrian Tunnel Mods Earthwork & Site Utilities JE Dunn Construction invites written Bids from qualified Trade Partners to provide construction services for HQ Employee Lot and Pedestrian Tunnel Mods on the PACR project. JE Dunn Construction invites written Bids from qualified Trade Partners to provide construction services for Earthwork & Site Utilities on the PACR project. A complete copy of the Bidding Documents can be obtained by emailing Robert Means at Robert.Means@jedunn.com. Bids may also be delivered by email to Robert Means. Bids due: 2:00pm, March 23, 2018 A complete copy of the Bidding Documents can be obtained by emailing Robert Means at Robert.Means@jedunn.com. Bids may also be delivered by email to Robert Means. Bids due 2:00pm PST April 13, 2018 Any Bid received after the specified date and time will not be considered. Any Bid received after the specified date and time will not be considered. Non-mandatory, Pre-Bid Conference will be located at the PDX Conference Center, 7000 Airport Way, St. Helens B Conference Room, on March 16, 2018 at 2:00 PM for answering questions regarding the Scopes of Work on the Project. JE Dunn Construction reserves the right to select the best value response, negoti- ate with multiple bidders, or reject all responses. This is an Equal Opportunity and encourages Minority, Woman, Veteran, and Emerging Small Business participation 2-28, 3-21-18 A non-mandatory pre-proposal conference will be located at the PDX Conference Center, 7000 Airport Way, Multnomah Conference Room, on March 30, 2018 at 2:00 PM for answering questions regarding the Scopes of Work on the Project. JE Dunn Construction reserves the right to select the best value response, negoti- ate with multiple bidders, or reject all responses. This is an Equal Opportunity and encourages Minority, Woman, Veteran, and Emerging Small Business participation. 3-21,4-4-18