The skanner. (Portland, Or.) 1975-2014, March 21, 2018, Page 11, Image 11

Below is the OCR text representation for this newspapers page. It is also available as plain text as well as XML.

    March 21, 2018 The Skanner Page 11
Bids & Classified
Advertising deadlines 12:00 Noon Monday
Hours: Monday - Friday 8:30 a.m. - 5:30 p.m.
Review
cont’d from pg 6
She doesn’t have to be so
poor, given that she’s the
only heir to a massive
fortune left behind by
her parents, Lady and
Lord Croft.
While her mother is
really dead, there’s no
proof of her father’s
(Dominic West) pass-
ing. Lord Croft was an
archaeologist/explorer
who went missing seven
years ago on an expedi-
tion to an uncharted spot
in the ocean off the coast
To place your ad, email advertising@theskanner.com
or go to www.TheSkanner.com and click on the “Ads” menu
of Japan. He was search-
ing for a fabled tomb ru-
mored to contain a key to
a supernatural realm.
Instead of signing dad-
dy’s death certificate, ac-
cepting her inheritance,
and living in the lap of
Bids Due: April 4, 2018 by 2PM
Bid Documents are available to review and
download on Andersen’s Egnyte file. Below is a
link to the project documents.
Sitework / Site Utilities / Excavation,
Steel Package, Elevators
Oregon State University
Marine Studies Initiative Building
2030 SE Marine Science Drive
Newport, OR 97365
Permit Set Documents: https://andersencloud.
egnyte.com/fl/24NxYwn8xl
The Bid Date Changed.
In order to be considered, your bid must be sub-
mitted on the bid form provided.
Bids are now due on Tuesday,
March 27, 2018 by 2PM
Project Description: Core and Shell scope for a
new surgery/ICU addition consisting of two parking
levels, four floors, and a mechanical penthouse.
Project Description: The Marine Studies Initiative
building is a new state of the art three-story 73,000
SF laboratory facility consisting of research and
teaching laboratories, offices, and a 250-person au-
ditorium. It is located on the Oregon State University
Hatfield Marine Science Center campus in Newport,
Oregon.
Scope of work included in Pkg. 2: Selective Dem-
olition, Misc Concrete, Masonry, Structural and Misc
Steel, Steel Stairs, Waterproofing, Metal Panels,
Terracotta Panels, Roofing, Fireproofing, Expan-
sion Joints, Doors, Frames, Hardware, Curtainwall/
Punched Openings, Skylights, Walls and Ceilings,
Painting, Signage, Parking Control Equipment, Fire
Suppression, Plumbing, HVAC Systems, Electrical
and Low Voltage, and Landscaping.
Pre-Bid Meeting (not mandatory): Tuesday, March
20th at 10:00 AM at project site.
All request for clarification must be submitted
prior to 3/23/18 at 5 pm. Please submit via email
to the following:
Jerrod Kowalewski
jkowalewski@andersen-const.com
Tony Carlson – tcarlson@andersen-const.com
Submit bids to all of the above contacts via
email by 4/4/18 by 2 pm.
Instructions for Andersen’s Prequalification Mod-
ule are posted on our Egnyte folder. (See address
above)
All bidders must be prequalified or have submitted
their prequalification package prior to submitting a
bid.
to survive an epic fight
to the death with a wor-
thy adversary (Walton
Goggins) and his gang of
goons armed to the teeth.
Think “The Da Vinci
Code,” with less talk and
way more action.
Very Good HHH
Rated PG-13 for violence
and some profanity
SUB-BIDS REQUESTED
Trafton Creek and Schoolyard
Creek Remove Fish Barrier
BID PROPOSALS
REQUESTED
SUB-BIDS REQUESTED
Legacy Emanuel Medical Center
Pkg. 2: Core & Shell
luxury, Lara follows a set
of mysterious clues he
left behind leading to a
an island resembling the
Rock of Gibraltar. Upon
arriving, she must rely
on her wits and her acro-
batic and archery skills
Documents: 50% CD Package by YGH Architects
– Sitework / Excavation / Utilities, Structural
Steel, Elevators
Bid documents will be available end of day on March
5th, 2018 to review and download from Andersen’s
Egnyte site at:
7.01 - 50% CD Package (03-05-18)
https://andersencloud.egnyte.com/fl/YD2f1sYcoz
*All Wage Rates to be BOLI, January 1, 2018
Contacts: All requests for clarification are to be
submitted via email to Kris Anderson kanderson@
andersen-const.com and Chris Reetz creetz@an-
dersen-const.com. The cut-off date for all requests
for information (RFI’s) shall be Tuesday, March 13th,
at 5:00 PM.
All bids shall be submitted through email or deliv-
ered in a sealed envelope with a flash drive contain-
ing electronic documents to the attention of Chris
Reetz and Kris Anderson at the following address:
Andersen Construction | 6712 North Cutter Circle
| Portland, OR 97217 | ATTN: Chris Reetz & Kris
Anderson. See e-mail addresses above.
Bids Due: April 19, 2018 at 11AM PDT
Quotes Due by: April 11, 2018 at
5PM PDT
Scope Letter by: April 4, 2018 at
5PM PDT
Kiewit is soliciting subcontractor bids and material
quotes from subcontractors and suppliers, includ-
ing qualified Underutilized Disadvantaged Business
Enterprises who meet the criteria outlined in 49
CFR Part 26 and certified by the Washington State
Office of Minority and Women’s Business Enterpris-
es (OMWBE), for the following project:
Trafton Creek and Schoolyard Creek Remove
Fish Barrier
Owner: Washington State Department of
Transportation
CONTACT: Chris Parshall
33455 6th Ave South
Federal Way, WA 98003
PH: (253) 943-4200
FAX: (253) 943-4201
Email: NW.Estimating@kiewit.com
Services and supplies being solicited include: Engi-
neering Design Services, Drafting, Aggregate Sup-
ply, Asphalt Paving, Cellular Concrete, Civil Work,
Clearing & Grubbing, Cold Plane AC, Concrete
Barrier, Concrete Precast Materials, Construction
Survey, Crane, Electrical, Erosion Control, Environ-
mental BMP’s, Fencing, Field Biologist, Fish Exclu-
sion, Furnish and Install Rebar, Guardrail, Grading/
Drainage, Landscape Work, Pile Driving, Placing
and Pumping Concrete, Potholing, Quality Control/
Quality Assurance, Sawcutting, Shoring Systems,
Signing/Striping, Site Restoration, Site Security,
Structural Concrete Formwork, Traffic Barrier, Truck-
ing, Waterproofing.
Conceptual Plans and specifications can be
accessed from the WSDOT website at :
http://www.wsdot.wa.gov/biz/contaa/Contracts/
Trafton.html
6712 N. Cutter Circle
Portland, OR 97217
Phone 503-283-6712
Fax (503) 283-3607
6712 N. Cutter Circle
Portland, OR 97217
Phone 503-283-6712
Fax (503) 283-3607
CCB # 63053
CCB # 63053
We are an equal opportunity employer and strongly
encourage the participation of emerging small busi-
ness, women-owned, disadvantaged, disabled vet-
erans and minority enterprises.
We are an equal opportunity employer and strongly
encourage the participation of emerging small busi-
ness, women-owned, disadvantaged, disabled vet-
erans and minority enterprises.
3-14,3-21,3-28,4-4-18
3-21-18
The Design-Builder in accordance to Title VI of the
Civil Rights Act of 1964, 78 Stat.252, 42 U.S. Code
2000d to 2000d-4, and Title 49 Code of Federal
Regulations, Part 21, hereby notifies all bidders that
it will affirmatively ensure that in any contract en-
tered into pursuant to this advertisement, underuti-
lized disadvantaged business enterprises will be af-
forded full opportunity to submit bids in response to
this invitation and will not be discriminated against
on the grounds of race, color, national origin and
sex in consideration for an award
We are an equal opportunity employer.
3-14,3-21,3-28-18
Portland International Airport (PDX) Parking Additions and
Consolidated Rental Car Facility (PACR)
Portland International Airport (PDX) Parking Additions and
Consolidated Rental Car Facility (PACR)
HQ Employee Lot & Pedestrian Tunnel Mods
Earthwork & Site Utilities
JE Dunn Construction invites written Bids from qualified Trade Partners to provide
construction services for HQ Employee Lot and Pedestrian Tunnel Mods on
the PACR project.
JE Dunn Construction invites written Bids from qualified Trade Partners to provide
construction services for Earthwork & Site Utilities on the PACR project.
A complete copy of the Bidding Documents can be obtained by emailing
Robert Means at Robert.Means@jedunn.com. Bids may also be delivered by email
to Robert Means.
Bids due: 2:00pm, March 23, 2018
A complete copy of the Bidding Documents can be obtained by emailing
Robert Means at Robert.Means@jedunn.com. Bids may also be delivered by email
to Robert Means.
Bids due 2:00pm PST April 13, 2018
Any Bid received after the specified date and time will not be considered.
Any Bid received after the specified date and time will not be considered.
Non-mandatory, Pre-Bid Conference will be located at the PDX Conference Center,
7000 Airport Way, St. Helens B Conference Room, on March 16, 2018 at 2:00 PM for
answering questions regarding the Scopes of Work on the Project.
JE Dunn Construction reserves the right to select the best value response, negoti-
ate with multiple bidders, or reject all responses. This is an Equal Opportunity and
encourages Minority, Woman, Veteran, and Emerging Small Business participation
2-28, 3-21-18
A non-mandatory pre-proposal conference will be located at the PDX Conference
Center, 7000 Airport Way, Multnomah Conference Room, on March 30, 2018 at 2:00
PM for answering questions regarding the Scopes of Work on the Project.
JE Dunn Construction reserves the right to select the best value response, negoti-
ate with multiple bidders, or reject all responses. This is an Equal Opportunity and
encourages Minority, Woman, Veteran, and Emerging Small Business participation.
3-21,4-4-18