ADVERTISEMENT FOR BIDS • ADVERTISEMENT FOR BIDS • ADVERTISEMENT FQR BIDS
Advertisement for Bids
Invitation to Bid
for
E. Burnside Street Water Line Relocation
Schedule C
(Revised)
Sealed bids will be received by Portland Community College, by Mr Ray
Smith, Vice President of College Administrative Services. 12000 S.W . 49th
Avenue. Portland, Oregon 97219, until 2:00 P .M ., Pacific Daylight Time,
Thursday, July 19, 1984, in Room B20C College Centers Building, for the
Portland Community College. Caecade Center Peninsula Had. Bids sre to be
reed aloud in Room B19 College Centers Building
Rebid
Seeled proposals for furnishing ell materials, equipment and labor for the
construction of w ater lines for ths Hazelwood W ater District will be
received at the District office at 1017 N.E. 117th Avenue, Portland, Oregon,
97220, until 2:00 p.m., Tuesday, July 10, 1984. Immediately thereafter,
such proposals will be publicly opened and read. A contract will be awarded
or bids rejected within sixty (00) days after the opening.
Schedule C (Revised) consists of three 13) separate bid schedules, C-1, C-2
and C-3. Bidders may elect to bid on any combination of thesa three
schedules
The overall work proposed for Schedule C (REVISED) consists of furnishing
and installing 45 lineal feet of 10-inch diameter, 644 lineal feet of 8-inch
diameter and 6,088 lineal feet of 6-inch diameter ductile iron, Class 52 pipe,
including corrosion protection miscellaneous lengths of 4- through 10-inch
PVC pressure pipe, excavation, backfill, thrust restraint, valves, fittings and
appurtenances Included are six water main crossings of E. Burnside Street
encased in Class III Reinforced Concrete Pipe Crossing range in s in from
8" D .l. to 14" D .l. wster lines. Also included is the installation of ap­
proximately 72 3/4-inch house services, 17 1-inch services, 1 1- H-inch ser­
vices, and 4 2-inch services which consist of furnishing and installing cop­
per service lines, connection, corporation stops, curb stop, handwheel
valves, excavation, backfill, surface restoration and appurtenances.
Plans and Contract Documents may be examined in the Hazelwood Water
District o ffice or at the o ffice of the Consulting Engineers, LEE
ENGINEERING, IN C ., 708 Main Street, Suite 202, Oregon City. Oregon
97046
A copy of said Documents may be obtained from the Engineer's office upon
request. A deposit of »40 per copy will be charged. This deposit will be
refunded if plans and specifications are returned to the office of the
Engineer in good condition within fifteen (16) days of bid data; half the
deposit fee will be refunded if returned after the fifteen-day period. No
refunds will be made after 30 days
All Proposals must be submitted on the forms furnished and each must be
accompanied by a bid guarantee in the amount of ten (10) percent of the
total bid.
The successful bidder will be required to furnish a bond for faithful perfor­
mance of the contract in the full amount of the contract price.
No bid will be received or considered unless the bidder intends to comply
with the provisions of ORS 279.360. "Workmen to be paid not lesa than
prevailing wage ra te s ." A statem ent of which is included in the bid
proposal.
The Hazelwood W ater District reserves the right to reject all bids and to
waive all informalities, or to accept any bid or combination of bids which
appears to serve the beet interests of the District.
Brief description of the proposed work:
Briefly, the work is described as removal or enclosure of all asbestos-
containing materials located in the attic air plenum. Lincoln Hall. Portland
State University. Portland. Oregon. Also included is replacement insulation
for all materials removed as a result of asbestos abatement work of this con­
tract
Construction consists of wood stud sxterior and interior walls. Interior
finish materials will involve plaster, thin-coat plaster on wood studs,
millwork, painting, suspended acoustical ceilings, vinyl asbestos tile, and
carpeting. Mechanical, plumbing, electrical, and related work will be in­
volved in the project.
Bids will be received on a lump-sum basis for all of the work One set of
drawings, specifications and forms of contract documents may be obtained
by prime bidders only, from University Services, 617 S .W Montgomery,
Portland State University. Portland. Oregon, upon deposit of »20. Ad­
ditional sets may be obtained for the cost of reproduction
Two sets of drawings and one set of specifications may be obtained from
Richard H. Eslick, Architect end Planner, 9 Bernini Court, Lake Oswego,
Oregon 97094, by prime bidders upon a deposit of »76 00. Additional prints
may be purchased for the cost of reproduction.
Drawings, specifications and forms of contract documents may be
examined at the office of University Services and at the following plan cen
tars: 1. Builder's Exchange Cooperative, 1126 S.E Madison, Portland.
Oregon 97214, (603) 234 0281; 2. Northwest Plan Center. 901 S.E. Oak
Suite 208, Portland. Oregon 97214, (603) 232-4000; 3. Through the services
of: Dodge Scan, 315 North Tower Building. 100 W. Harrison Plaza, Seattle.
Washington 98119, (206) 248 3811; 4. Construction Data Plan Center, 925
N .W . 12th, Portland. Oregon 97209, (503) 226-0200.
The deposit made upon the procurement of the documents will be refunded
upon the return thereof, in good condition, within two (2) weeks after bid
opening providing drawings and specifications are returned in ORIGINAL
BOUND CONDITION, free of markings, and suitable for use during con­
struction.
Prime bidders will be required to be prequalified with Portland Community
College at least ten (101 days pnor to the date set for the bid opening in ac­
cordance with ORS Chapter 279. Prequalification forms may be obtained by
prime bidders from the A rchitect along w ith the drawings and
specifications
Bidders for this work are required to be prequalified in accordance with the
Oregon State Board of Higher Education's administrative rule. Applications
for prequalification (or notice of intent to bid if the contractor has a current
prequalification application on file with the Undersigned) must be received
at least ten (10) days before the bid opening, end shall include additional
qualifications required by Article SB-1 of Supplementary Instructions to
Bidders. Division SB.
W e are actively requesting minority and female enterprises involvement for
this project.
All bids must contain a statement assuring compliance with ORS 279.350
relating to prevailing rates of wage.
No bid will be considered unless fully completed in the manner provided in
the "Instructions to Bidders" upon the Bid Form provided by the architect.
Each bid shall be accompanied by a certified check or a bid bond executed
in favor of Portland Community College. 12090 S .W 49th Avenue, Port­
land. Oregon 97219, in an amount not less than ten percent (10%) of the
total amount of the bid. This check or bid bond shall be forfeited as fixed
and liquidated damages should the bidder neglect to, or refuse to, enter in­
to a contract and provide suitable bond for the faithful performance of the
work in the event the contract is awarded to him.
No bid will be considered unless fully completed in the manner provided in
the "Instructions to Bidders" upon the Bid Form provided by the Owner
and accompanied by bid security executed in favor of the State of Oregon
and the Oregon State Board of Higher Education in an equal amount to ten
(10) percent of the total amount of the bid, to be forfeited as fixed and
liquidated damages should the bidder neglect or refuse to enter into a con­
tract and provide suitable Bond for the faithful performance of the Work in
the event the contract is awarded to the bidder
The Portland Community College reserves the right to reject any or all bids
and to waive all informalities.
No bidder may withdraw his bid after the hour set for the opening thereof
until after the elapse of thirty (30) days from the bid opening.
Ray M. Smith
Vice President of College
Administrative Services
Portland Community College
12000 S .W 49th Avenue
Portland, Oregon 97219
COUNTY OF CLARK
Invitation to Bid
Bid No. 1321
Request for Proposal
YACOLT WATER PUMPING FACILITY AND TRANSMISSION MAIN
TO CONNECT TO TOWN WATER SYSTEM.
Sealed bids for Lincoln Hall Attic Asbestos Abatement. Portland Stata
University. Portland, Oregon will be received by the Oregon State Board of
Higher Education at Room 202E, Second floor of University Services
Building at 617 S W Montgomery. Portland State University. Portland.
Oregon, until 3:00 p.m Pacific Daylight Time. Tueedey. July 10. 1984 and
then publicly opened and read aloud by the Undersigned or his designated
representative
The project consists of remodeling an sxisting two story building shell in­
volving approximately 2600 square feet of remodeled space and a new ad­
dition of 800- square feet on the ground level The structure will contain of
fice space with related storage, rest rooms, etc.
By order of the Board of Commissioners, Hazelwood Water District.
NOTICE IS HEREBY GIVEN THAT SEALED BIDS will be received by the
Board of County Commissioners in the Office of Purchasing/Central Sup­
port Services. 1408 Franklin Street. Vancouver, Washington, UNTil 9:60
A .M . on the 11th day of July, 1984 for the purpose of securing:
Advertisement for Bids
Notice is hereby given that the Tri-County metropolitan Transportation
District of Oregon (Tri-Met) will receive proposals until 2:00 PM, Pacific
Daylight Time on July 16. 1984. at Contracts and Legal Services Section,
Third Floor. 4012 SE 17th Avenue. Portland, Oregon 97202, Attention:
John R. Post, Acting Director, Engineering and Contracts. Proposals will
be evaluated subsequent to the above time and date for:
The Oregon State Board of Higher Education reserves the right to reject all
bids and to waive all informalities.
No bidder may withdraw a bid after the hour set for the opening thereof un­
til after the elapse of 30 days from the bid opening.
OREGON STATE BOARD OF HIGHER EDUCATION
By: J.I. HUNDERUP
Vice Chancellor for Facilities Planning
Advertisement for Bids
Notice is hereby given that the Tri-County Metropolitan Transportation
District of Oregon (Tri-Met) will receive sealed bids until 2:00 p.m.. Pacific
Daylight Time on 19 July 1984, at 4012 S.E. 17th Avenue in the Contracts
and Legal Services Section. Third Floor, Portland, Oregon 97202, Atten­
tion: John R. Post, Director, Engineering and Contracts. Bids will be
opened in Conference Room "d" at that time for:
PROCUREMENT OF MINORITY-ORIENTED PUBLICATION SER­
VICES FOR TRI MET ADVERTISING, BID NO. 84 876A
The successful bidder shall be required to comply with all applicable Equal
Opportunity and MBE/FBE laws and regulations.
Westside Light Rail Transit Financial Planning RFP No. 84-889
Bids will be opened by the Board at approximately 10:00 a .m ., July 11,
1984, subject to the agenda of the Board of County Commissioners Bid in­
vitations and specifications may be seen and copies may be obtained in the
Office of Purchasing/Central Support Services at the above address.
The successful proposer shall be required to comply with all the applicable
Equal Opportunity and MBe laws and regulations.
The County reserves the right to reject any and all bids and waive infor­
malities.
All proposers shall be required to certify that they are not on the Comp­
troller General's list of ineligible contractors.
Clark County Purchasing/Central Support Services
The Tri-County Metropolitan District of Oregon does not discriminate with
regard to race, color, sex. or national origin.
Invitation for Proposals
The Request for Proposal may be obtained from the Contracts and Legal
Services Section, Phone: (603) 239 6486
All bidders «hall be required to certify that they are not on the Comptroller
General's list of ineligible contractors.
The Tri-County Metropolitan Transportation District of Oregon does not
discriminate with regard to race, color, creed, sex or national origin.
The bid documents may be obtained from the Contracts and Legal Services
Section, Phone: (503) 239-6486, by referencing Bid No. 84-876A
TRI-COUNTY METROPOLITAN TRANSPORTATION
DISTRICT OF OREGON
CITY OF PORTLAND
TRI COUNTY METROPOLITAN TRANSPORTATION
D IS TR IC t OF OREGON
PROPOSALS DUE 2:00 P.M ON VARIOUS DATES
Sealed Proposals will be received at the Bureau of Purchases and Storea.
Room 412, City Hall. Portland, OR 97204, for the Commodities and Projects
detailed below until 2:00 P.M. on the dates indicated.
Date J u n e 2 7 ,1984
The City encourages bidding by MBE's and FBE's and will assist such firms
to understand and participate in formal bidding processes
Notice of Availability of HCD
Final Statement
Advertisements for Proposals
Notice is hereby given that Washington County will receive proposals for
providing services in organizing and facilitating review and comment by an
appointed citizen com m ittee regarding regional transportation im ­
provements until 4:00 P M . Pacific Time, on 13 July 1984, at 150 North First
Avenue, Hillsboro, Oregon 97123, Attention: Brent Durtis.
NON DISCRIMINATION: No proposal or bid will be considered unless the
bidder is certified as an EEO Affirmative Action Employer as prescribed by
Chapter 3.100 of the Code of the City of Portland,
The successful proposer shall ba required to comply with all applicable
Equal Opportunity and MBE/FBE laws and regulations.
Bid No.
All proposers shall be required to certify that they are not on the Comp­
troller General's list of ineligible contractors.
C 9604
Opening Date
Improve SE 91 AVE Et SE Bfcs St Et Construct Storm
Drainage Sumps. Carfton Chayer, Asst Purchasing
Mgr, 248-4474. Prequalification in Claaa 2-Street Im­
provements Raquired
C 9626
Improvs SE 74 Ave From SE Knight To SE Ellis St Et
Construct Sumps Carfton Chayer. Asst Purchasing
Mgr. 248-4474. PrequaHflcation in Claaa 2-Streat Con­
struction Raquired
142
*4
Description
Food Et Beverage Concessions at Civic Auditorium/
Perform ing Arts Center. Michele Ackerm an,
Sr. Buyer. 248-4191.
;
' a
<
*
I-
Date: 27 June 1984
John R. Post, Acting Director
Engineering and Contraete
Plans and Specifications may be obtained at the above address For ad­
ditional information, telephone Buyer at number listed
Unless otherw ise stated in the individual proposals listed herein, no
proposal or bid will be considered unless accompanied by a bid surety for an
amount not less than ten percent (10% ) of the aggregate amount of the
proposal.
John R. Post, Director
Engineering and Contracts
The "Final Statement of Objectives and Projected Use of Funds" for the City
of Portland's 84 85 Housing and Community Development Program was
submitted to the U S. Dept of Housing end Urban Development on June 4,
1984.
Copies of the statement are available from the Bureau of Community Develop­
ment Office at 1120 S.W . 6th Avenue. Rm. 1120, Portland, OR 97204, Tel.
796-5186
Mark S. Davis, Director
Bureau of Community Development
City of Portland
Washington County does not discriminate with regard to race, color, creed,
sex or national origin.
7/10/84
The Request for Proposals may be obtained from Washington County on or
after 2 July 1984, phone: 1503) 640-3619.
TRI-COUNTY METROPOLITAN TRANSPORTATION
DISTRICT OF OREGON on behalf of
W ASHINGTON COUNTY
7/1 0 /8 4
John R. Post. Acting Director
Engineering and Contracts
7/1 0 /8 4
D ,,e June 27, 1984