STATE OF OREGON DEPARTMENT OF TRANSPORTATION HIGHW AY DIVISION NOTICE TO CONTRACTORS pafl0 12 Portland Observer April 2 , 1»1 INVITATION TO BID FOR CONSTRUCTION OF WATER SUPPLY PROJECT PHASE II: WATER TRANSMISSION PIPELINES SCHEDULE C -R E B ID FOR THE CONFEDERATED TRIBES O FTHE W ARM SPRINGS RESERVATION W ARM SPRINGS, OREGON Soaled proposals to furnish materials, equipment, labor and services of all kinds for the construction of Water Supply Project, Phase II: Water Trans mission Pipelines, Schedule C - Rebid will be received by the Confederated Tribes of the Warm Springs Reservation at the Kah-Nee-Ta Lodge Resort, Warm Springs, Oregon 97661, until the time and date stated below, and immediately thereafter such proposals will be publicly opened and read. Bid envelopes shall be marked with the name of the bidder and the title of the job: Time and date until which proposals will be accepted: 3:00 p.m. April 30, 1981. The work to be performed includes installation of approximately 26,700 lineal feet of ductile iron, steel, and/or concrete cylinder water transmission pipeline ranging in size from 10-inch to 8-inch together with valves, blowof fs Reverend Herbert Daughtry. President of the National Block United Front, addresses a group at King Neighborhood Facility. (Photo: Richard Brovvnl The work to be performed includes installation of approximately 26,700 lineal feet of ductile iron, steel, and/or concrete cylinder water transmission pipeline ranging in size from 10-inch to 8-inch together with valves, blow offs, outlets, drains, appurtenances, and related work. This work is a rebid of Schedule C only which includes approximately 23,300 lineal feet of 10- inch ductile iron, steel, or concrete cylinder pipe, and approximately 3,400 feet of 8-inch ductile iron or steel pipe. Sealed proposals on the following project will be opened and read by the Highway Division in Room 122, Transportation Bldg., Salem, Oregon, at 3 p.m., on Thursday, April 30, 1981. Proposals shall be submitted to Robert W. Gormsen, Manager of Commission Services, prior to 3 p.m . on the above date. For this project bidders shall be prequalified in the class of work indicated. MULTNOMAH COUNTY: Justice Center, Phase 3, in Portland. FA Project No. 1-205-7(76)312. Req. approx. 25,000 cu. yds. cone.; exterior building enclosure, including glass store fronts, precast covers, entry doors and roofing, vertical transportation system, including hydraulic elevators, police hi-rise and dentention secure elevators; interior finishes, HVAC; plumbing, fire protection; life safety; electrical and security systems; curb, sidewalk; landscaping. Completion time December 31, 1983 Class of work: Building construction. THIS PROJECT CONTAINS MINORITY BUSINESS ENTER PRISE GOALS. A prebid meeting w ill be held in the second floor con ference rooms of the Edith Green Wendall W yatt Federal Building, 1220 S.W. 3rd Avenue, Portland, at 9:00 a.m. on April 13, 1981. Requirements concerning m inim um hourly wage rates, hours of em ployment, overtime, etc., accompany the special provisions for this project and must be complied with. No bid w ill be received or considered by the public contracting agency unless the bid contains a statement by the bidder as a part of this bid that provisions of ORS 279.350 shall be complied with. In compliance with the Civil Rights Act of 1964 the State Highway Division hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business enterprise will be afforded full opportunity to submit bids in response to this invitation and w ill not be discrim inated against on the grounds of race, color or national origin in consideration for an award. Plans and specifications may be examined at the following locations: BUF leader speaks here Grassroot News, N.W . - During the early part o f last week, the Pacific Northwest was host to Reverend Daughtry, the national chairperson o f the National Black United Front, and presiding minister o f the House o f the Lord churches in New York. In the last two decades Reverend Daughtry and his congregation have par ticipated in protest action with the Brooklyn C .O .R .E ., Operation Breadbasket, and Laity and Clergy Concerned. Reverend Daughtry commenced his presentation with a discussion of contemporary events. “ These are some of the most critical times that we have faced in our history, and that history has been a history o f critical times. There are factors now which makes these times a lot more critical. Among these factors is the violence that comes down to us from abusive police power. This violence from the police is far more devasting to us than the violence from the new and old right and the KKK - not that there’ s a difference because many times they’ re the same persons. What is so devastating about police violence is that i t ’ s the kind o f violence that people sleep on. “ During the 60s the marching and the blood that was shed elevated some of us into social mobility while it left the masses behind. There was some progress since it is better than it use to be, but the progress gained was not economic. The progress d id n ’ t spread wide enough and it didn't go deep enough. What it did was create the illusion that we are all that way because a few o f us were allowed to earn our way • to get a house away from the rest o f us. It became apparent after a while that the masses of us have not really progressed at all. And thus in Mississippi when those two words came out ‘ Black Power' it tapped what was always there, disappoint ment and discontent. W ith Black Power came a new level o f con sciousness and everybody that had been a Negro before had become Black. Our style had changed; our hair had changed; what we used to be ashamed o f, we no longer felt that way. For the next five years Black Power was inescapable. You had to be for it or against it. And like so many things that we set in motion, it had to be destroyed. “ What did Black Power in, was the C O IN TEL program where the legal apparatus o f this country destroyed the movement o f the people. The F B I. had brothers from the Panthers, US and the African Revolutionary Party killing one another. Another thing that • estroyed the movement was the acification program. It was just nough to cool us out. One other factor that destroyed the movement was the Negro leadership which had control o f grants and media so that they were able to bounce back. These are some o f the things that brought Black Power to a stand still. You might say that we had a strategic retreat. “ The final thing that put the power out was the betrayal o f white folks from the le ft and the right. What we came to understand was, he that would be free, must strike the blow himself. Black people must find their own basis for liberation and we must fin d out under what condition whoever come along It would be w onderful it Black and white labor could work together, but the reality of the situation is that white labor has identified more with the ruling class than with us at any point in our history. “ When the latter part o f the 70s rolled about, we began to sense a change. There was hope to put the movement back on track again - and this time we would go all the way. After the elections, people who use to do other things now spent their weekends doing serious th inking and left boogie behind. They begin to understand that their jobs were on the line. When we looked around we found that the KKK had come out o f the closet, the Nazis had came back out o f hell and from one end of the country to the other, the police were killing us left and right. “ Other things that happened were the cutbacks of survival services and the recapturing o f certain vital parts o f the city. The closing down o f a hospital or a school meant the closing down o f a community. The people who said that they d id n ’ t want to live there could now come back. Everybody seems to know that we’ re in a war but us. There’ s no way you can cut services o ff to a people unless you intend to destroy that people. The people in control can do a thing and predict the behavior o f a people. They can either k ill us o ff directly or so arrange our behavior so that we will act a certain way, so we have to be killed o ff just to m aintain order. That way they w ill feel ju s tifie d doing it. “ A new world economic order is just around the corner and the 3% who control everything now are fig hting to m aintain because the count is almost on ten. Today nations are saying, ‘ you back-up o ff my resources because 1 want to con tro l my own. The current ad ministration is aware o f this and as they cut back survival services, the m ilita ry budget goes higher and higher. I see hope not only in the National Black United Front, but also in the international aspect. A new day is on the way and we w ill have to make our own way.” Tribal Administration Building Warm Springs, Oregon 97761 STRAAM Engineers 700 Plaza 600 Seattle, Washington 98101 Copies of the plans and specifications may be examined or obtained upon application at the office of STRAAM Engineers, 5505 S.E. M ilwaukie Avenue, P.O. Box 02201, Portland, Oregon 97202, upon payment of a deposit condition within 15 days after bid opening. If the drawing and/or specifications are damaged so as to preclude their future use, or if they are not returned within the 15-day period, the entire deposit will be retained. Plans and specifications will be mailed first class. Those desiring air mail, parcel post, or special handling shall include with their requerst for plans and specifications a check, or money order, separate from the plan deposit, in the amount of $5.00 for each set requested. All proposals must be submitted on the regular forms furnished with the specifications. No proposals will be considered unless accompanied by a certified check, cashiers check, or bid bond payable to the Confederated Tribes of the Warm Springs Reservation for the amount equal to ten per cent of the total bid. The successful bidder shall furnish a performance bond and payment bond satisfactory to the Confederated Tribes of the Warm Springs Reservation each in the full amount of the Contract. The successful bidder, upon his failure or refusal to execute and deliver the Con tract and bonds within ten days after he has received notice of acceptance of his bid, shall forfeit to the Confederated Tribes of the Warm Springs Reservation of such failure or refusal the security deposited with his bid. No proposal will be received or considered by the Confederated Tribes of the Warm Springs Reservation or any of its officers unless the proposal contains a statem ent by the bidder as a part of his proposal that the provisions required by ORS 279.350 shall be included in his contract. The successful bidder will be required to comply with the conditions and requirements of the Economic Development Administration of the U.S. Department of Commerce including, but not lim ited to, payment of minimum wages under the Davis-Bacon Act Wage Determination, Oregon Decision Number OR 80 5145 as published in the Federal Register Vol. 45, No. 227, November 21, 1980 The confederated Tribes of the Warm Springs Reservation reserves the right to reject any or all bids, waive informalities, or accept any bid or com bination thereof which appears to serve the best interests of the owner. By Order of the Tribal Council Warm Springs, Oregon ADVERTISEMENT FOR BIDS Notice is hereby given that the Tri-County Metropolitan Transportation District of Oregon (Tri Met) will receive sealed bid proposals until 2:00 P.M. PST on April 22, 1981 at 4012 S.E. 4012 S.E. 17th Avenue in the Planning and Development Division, Third Floor, Conference Room " D ," Portland, Oregon 97202, Attention: Clyde Keeling, Contract Specialist. Bids will be opened at that time for: The replacement and changing of trip and route panels and masks and bus stop masks on the Portland Mall, 5th and 6th Avenues. In com pliance w ith Federal H ighw ay A d m in istra tio n N otice 5080.82, bidders are hereby notified that for a project all bids may be rejected if the lowest responsive bid received exceeds the engineer's estimate by more than 7 percent. In the event all bids for a project are rejected for this reason, the project may be deferred for readvertising for bids. Plans and specifications may be inspected at this time at the Transportation Building in Salem: AGE Offices in Seattle and Spokane; Builders Exchange Cooperative, Portland, and Eugene Builders Exchange. There is no charge for the first set of plans and specifications. A charge of $150 will be made for each additional set of plans and specifications. Plans may be obtained in Room 121 or Room 1, Transportation Building, Salem, OR 97310, or by telephoning 378-6526 or 378-6293. A toll free in-watts line for use in Oregon only (1 800-452 7813) is also available. Prequalification by prime contractors will be required 10 days prior to the bid opening date. The last day for filing for this letting will be April 20, 1981. The right is reserved to reject any and all proposals or to accept the proposal deemed best for the State of Oregon. H.S. Coulter State Highway Engineer CITY OF PORTLAND INVITATION TO BID Sealed proposals will be received in Room 412, City Hall, Portland, Oregon 97204 for items detailed herein until 2:00 P.M. on the dates indicated. Plans and specifications may be obtained at the above address. For ad ditional information telephone buyer at number listed. When Bid Surety is required, proposals shall be accompanied by a certified check, cashier's check or a bid bond, payable to the City of Portland for an amount not less than ten percent (10%) of the aggregate amount of the bid as guaranty that the bid shall be irrevocable for the period specified in the proposal. Said bond to be forfeited as fixed and liquidated damages should the bidder seek to revoke his offer for any reason not authorized by law and not consented to by City within the irrevocable period, or neglect or refuse to enter into contract and provide a suitable bond for the faithful perfor mance of the contract, in the event the said contract is awarded to him. NON DISCRIMINATION: No proposal or bid will be considered unless the bidder is certified as an EEO Affirmative Action Employer as prescribed by Chapter 3.100 of the Code of the City of Portland. All bidders not currently certified should file the required documentation w ith the Contract Com pliance Division, Room 209, City Hall, 1220 SW Fifth Avenue, Portland, Oregon 97204, 248 4696, at least five (5) days prior to the Bid Opening. Failure to achieve certification by the Bid Opening Date and Time shall result in the return of your Bid Unopened. BID NO. The Tri-County Metropolitan Transportation District of Oregon will not discriminate with regard to race, color, creed, sex or national origin, in con sideration for contract award. The bid documents, including specifications, conditions, and rules for bid ding, may be obtained from Clyde Keeling, Contract Specialist. Phone: 238 4808. TRI COUNTY METROPOLITAN TRANSPORTATION blSTRICT OF OREGON Paul N. Bay, Executive Director Planning Et Development Division Improving SW 49 Ave from Center Line of SW Dickinson St to its Northerly Terminus Et Installing Sewer Pipe. For information call Michele Acker man, Buyer, 248 4191. 10% Bid Surety Required. C 9092 Improve Portions of N Argyle St., N Kerby Ave Et N Albina Ave Et Construction Storm Sewer. For inform ation call Michele Ackerm an, Buyer, 248 4191. 10% Bid Surety Et Prequalification of Bidder Required. 04/14/81 Construct SW 45 Drive Sanitary Sewer System. Nancy Kearney, Buyer, 248 Et Prequalification of Bidder & Private Property For inform ation call 4486. 10% Bid Surety Required. 04/14/81 Furnishing Annual Supply - Chrysler (OEM) Auto Et Truck Parts. For inform ation call Duane Gullixson, Buyer, 248-4004. 04/07/81 Labor, M aterial Et Equipment for Rose City Park Sewer Reconstruction. For information call Maxine Albright, Buyer, 248 4003. 10% Bid Surety Et pre qualification of Bidder required. 04/14/81 Labor, Material Et Equipment for Multnomah Multi- Use Center Renovation. For information call Michele Ackerman, Buyer, 248 4191. 10% Bid Surety & pre qualification of Bidder Required. $100 Refundable Deposit on Plans required. 04/16/81 C 8352 109-A 110 111 SUPPORT YOUR ADVERTISERS 1 BID OPENING DATE C 9274 Successful contractor w ill be required to comply with all the applicable Equal Opportunity laws and regulations. All bidders will be required to certify that they are not on the Comptroller General's list of ineligible contractors. DESCRIPTION I 04/09/81