EIGHT - Heppner Gazette-Times, Heppner, Oregon Wednesday, August 16, 2000 cated at 150 Rock Street, i Heppner, Oregon. Contractor shall furnish all of the materials and perform all of the labor necessary to complete the project. The project must be completed no later than November 23,2000. Job and contract specifications may be obtained from Les Paustian, Morrow County Courthouse, P.O. Box 788, Heppner OR 97836, (541) 676-5620. Sealed bids will be received by Les Paustian, at the same address as above, until 10:00 o ’clock a.m. on September 6, 2000, and then publicly opened and read aloud. No bid will be considered unless it contains a statement by the bidder that ORS 279.350 (prevailing wage law and prevailing wage rates) will be complied with, if applicable. Each sealed bid must be plainly marked on the outside of the envelope as “Roofing, Court­ house Annex”. Each bid must contain a statement as to whether the bidder is a resident bidder as defined in ORS 279.029. Morrow County may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding that it is in the public interest to do so. No bid shall be received or considered unless the bidder is licensed and bonded in accor­ dance with the laws applicable to the activity undertaken. Morrow County does not discriminate on the basis of race, color, national origin, sex, religion, age or disability in contracting, employment or the provision o f services. Morrow County re­ serves the right to reject any or all bids. For further information, con­ tact Les Paustian at (541) 676- 5620. BID INFORMATION MORROW COUNTY Job Description The Morrow County Court is seeking a contractor to paint the exterior o f the Morrow County Courthouse (to include windows, bell tower and other trim) located at 106 E May St., Heppner, Oregon. Contractor will provide all material, labor and supervision necessary to complete the project in accordance with the specifica­ tions set forth herein. Job Specifications 1. Using 28 gauge standing seam metal roof system. 2. Install 1 x 4 horizontal stripping. 3. Apply one coat exterior alkyd enamel (white). 4. Install condensation control blanket over entire roof. 5. Flash all roof penetrations 6. 10 year workmanship warranty. 7. Contractor shall supply all labor, supplies, material and supervision necessary to com­ plete the job 8. Job shall be complete on or before November 23, 2000. Contract Specifications 1 . Examination Prior to submitting a bid, Contractor shall examine these specifications, and shall become informed o f any existing conditions and/or limita­ tions. Contractor shall rely en­ tirely upon his or her own examinations in making a bid proposal and shall fully perform all o f the obligations required by the contract for the sum so bid. 2. Independent Contractor Contractor shall be performing as an independent contractor and shall provide all equipment, labor, materials, and supplies necessary to perform the project, including any controls, switches, etc. necessary to complete the project. 3. Prevailing Wage Rate Contractor or subcontractor or other person doing or contracting to do the whole or any part o f the work contemplated shall pay to all workers the existing prevailing rate o f wage. No bid will be received or considered unless the bid contains a statement by the bidder that the provisions o f ORS 279.348 to 279.380 (Prevailing Wage Rate) will be complied with, including: Fee Contractor or subcontrac­ tor or other person doing or contracting to do the whole or any part o f the work contemplated shall pay to the Commissioner of the Bureau o f Labor and Industries the fee required by ORS 279.375. The fee is one- tenth o f one percent o f the price o f this contract, but not less than $100 nor more than $5,000 regardless o f the contract price. NOTE: The prevailing wage rate provisions apply to any contract fora public improvement that exceeds $25,000. 4. Public Contracts Contractor affirms that he/she has read and is familiar with the provisions of ORS Chapter 279 and any local laws governing public contracts; and Contractor will agree to comply with all relevant law, including, but not limited to: f. Payments ORS 279.312, regarding prompt payment for labor and materials, payment of contributions to the Industrial Accident Fund, not permitting liens or claims against an owner by reason o f the materials or labor furnished, and the payment to the Department of Revenue of all sums described in ORS 316.167. g. Payment of Claims ORS 279.314, regarding the rights of an owner in the event Contractor fails to pay claims for labor and/or materials. h. Maximum Hours Contractor will also comply with the requirements o f ORS 279.316 regarding the maximum hours of labor allowed and the conditions under which overtime is permis­ sible. Contractor must pay weekly, holiday (including weekends) and daily overtime as required by law. l. Environmental ORS 279.318. regarding environmental and natu­ ral resource laws and rules; also change orders. j. Health Care ORS 279.320, regarding payment for medical care and attention on behalf of employees 5. Performance Bond Prior to commencing work, Contractor shall provide to County a performance bond in a sum equal to the amount o f the contract to protect County against any failure, misfeasance or malfea­ sance in the performance of the contract. 6. Drug Testing Prior to commencing work, Contractor shall provide to County a copy of the Contractor’s employee drug testing policy. 7. Resident Bidder Contractor must identify whether they are a resident bidder as defined by ORS 379.029. - ---------------------- 8. Registration Nobi