The skanner. (Portland, Or.) 1975-2014, November 13, 2013, Page 11, Image 11

Below is the OCR text representation for this newspapers page. It is also available as plain text as well as XML.

    Bids/Classifieds
To place your ad, email
advertising@theskanner.com
ADVERTISEMENT FOR BID
Lane Community College
Center for Student Success
BP #1 – Exterior Demolition
of Elevated Structures
Lane Community College, Eugene, Oregon
Advertisement for:
Center for Student Success – Bid Package #1
City of Portland
Wastewater Operator II
Sal: $23.19 - $28.89 Hourly
Open: 11/11/13
FFD: 12/02/13 04:30 PM
Lease Crutcher Lewis, LLC, serving as the Construction
Manager/General Contractor (CM/GC) for Lane Commu-
nity College is soliciting bids for the construction of the
Center for Student Success in Eugene, Oregon. Terms
and conditions of the bid are outlined in Lease Crutcher
Lewis, LLC (CM/GC) “Invitation to Bid”, dated November
8, 2013, attached to and made a part of the Contract
Documents.
Wastewater Operators II maintain established water
quality standards through the effective operation of all
equipment involved in the treatment process including
operating, monitoring and controlling a vast network of
pumps, conveyers, air and chemical systems; making
operational decisions including pumping rates and
dosage adjustments, while working in one of six work
units, which provide 24-hour coverage every day. For
more information and to apply for this job please visit us
at www.portlandoregon.gov/jobs/ An Equal Opportunity
Employer
Bids will be received at the offices of Lease Crutcher
Lewis, LLC, (CM/GC), 550 SW 12th Avenue, Portland,
Oregon 97205, until 3:30 PST, November 26, 2013 at
which time the bids will be publicly opened and read
aloud. Proposals shall be clearly marked “Center for
Student Success: Bid Package #__1__”
The total building construction cost is projected to be
approximately $26 million.
11-13-13
The scope of work for Bid Package #1 includes Demoli-
tion of the elevated concrete structures, specifically the
elevated terraces and the central stair on the West ele-
vation of the Center Building for Lane Community
College.
A mandatory pre-bid conference for the Exterior Ele-
vated Demolition scope of work (optional for
remaining scopes), will be held on November 15th at
1:00 pm at the jobsite location on the Lane Commu-
nity College Campus at NW corner of Center
Building. (approximate address for reference is 4000
E. 30th Ave, Eugene, OR 97405).
Contract Documents and the Invitation to Bid may be
reviewed at the following locations beginning November
11th: Lease Crutcher Lewis, LLC (CM/GC)/Portland, OR;
Construction Data & News/Portland, OR; Daily Journal
Plan
Center/Portland,
OR; Eugene
Builders
Exchange/Eugene, OR; Willamette Valley Builders Asso-
ciation/Tangent, OR; Oregon Assoc. of Minority
Enterprises/Portland, OR; Oregon Contractors Plan Cen-
ter/Clackamas,
OR;
Salem
Contractors
Exchange/Salem, OR; S.W. Washington Contractors
Assoc./Vancouver, WA.
Contract Documents may be purchased (non-refund-
able) in its entirety or in part from Precision Images,
(503) 274-2030.
Plans can also be viewed online via the following link:
www.bxwa.com.
Instructions: www.bxwa.com , Click on Posted Projects,
Click on General Contractor Project Areas, Click on the
State of Oregon, Click on Lease Crutcher Lewis, Click on
Portland Office, Click on Projects Bidding, Click on Lane
Community College Center for Student Success.
All proposers must comply with the following require-
ments: Prevailing Wage Law, ORS 279C.800-279C.870,
Licensed with Construction Contractors Board ORS
671.530. Bidder shall indicate Resident Status per ORS
279A.120. If Required, Bidders must obtain business
licenses to perform work in the City of Eugene prior to
mobilizing on jobsite.
Bids will not be considered unless RECEIVED by
3:30 p.m. PST on November 26, 2013, and fully com-
pleted in the manner provided by the “Instructions to
Bidders”.
“NOTICE OF REQUIREMENT FOR AFFIRMATIVE
ACTION TO ENSURE EQUAL EMPLOYMENT OPPOR-
TUNITY (Executive order 11246)”.
Lease Crutcher Lewis, LLC (CM/GC) is committed to tak-
ing affirmative action to encourage and facilitate the
participation of minority, women-owned, and emerging
small business enterprises (M/W/ESBE) in State proj-
ects and encourage Subcontractors to provide similar
opportunities for their subcontractors / vendors.
LEASE CRUTCHER LEWIS, LLC, (CM/GC)
1-13-13
APPLICATION SERVER
ADMINISTRATOR
SUB-BIDS REQUESTED
The Eugene Water & Electric Board is Oregon’s largest
customer - owned electric and water utility. We offer
employees a unique working culture where public serv-
ice is combined with development opportunities that
support employee growth and enhance job performance.
Employees at EWEB work in a dynamic environment
where creativity, innovation, involvement, safety, team-
work, and diversity are supported and encouraged. We
are currently recruiting for the following position: Applica-
tion Server Administrator
Tacoma Water Green River
Filtration Facility Project
Ravensdale, WA
Bid Package #GCSO-08: Metal
Fabrications, FRP Fabrications and
Access Hatches
Bid Package #GCSO-09: Painting and
Protective Coatings
EWEB offers a comprehensive benefit package, includ-
ing health care, vacation and sick leave, pension,
holidays, tuition reimbursement, an on-site fitness center
and child development center. For more information and
to apply online please visit our website at www.eweb.org
Pre-Bid Meetings:
November 6, 2013 @ 10:00am and
November 12, 2013 @ 11:00am
EWEB values diversity in its work force. EOE
11-13-13
Ella’s Kitchen
Bids Due: November 21, 2013 @
2:00pm
FORMERLY SOUP & SOAP
Bid documents may be examined at local
plan centers, viewed free of charge on-
line at http://www.bxwa.com, or obtained
at cost from United Reprographics,
206/382-1177
Southern Style Cuisine
(one taste will bring you back)
3505 N. Mississippi Ave.
Mon—Sun 8:00 AM - 7:00 PM
HOFFMAN
CONSTRUCTION
COMPANY
Breakfast
Lunch Special
Dinner
Seafood
Dessert
Phone: (206) 286-6697
1505 Westlake Ave North, Suite 500
Seattle, WA 98109
LIC # HOFFMCC164NC
We are an equal opportunity employer and request
sub bids from all interested firms including disad-
vantaged, minority, women, disabled veterans and
emerging small business enterprises.
Each Orders To Go .25¢
503-927-6708
11-06-13
We honor the many accomplishments of African Americans
It is our primary goal as a labor union
to better the lives of all people work-
ing in the building trades through
advocacy, civil demonstra-
tion, and the long-held belief
that workers deserve a "fami-
ly wage" - fair pay for an
honest day's work.
A family wage, and the bene-
fits that go with it, not only
strengthens families, but also
allows our communities to
become stronger, more cohe-
sive, and more responsive to
their citizens' needs.
Our family wage agenda
reflects our commitment to
people working in the build-
ing trades, and to workers
everywhere. In this small
way, we are doing our part to
help people achieve the
American Dream. This dream
that workers can hold dear
regardless of race, color,
national origin, gender,
creed, or religious beliefs.
The Pacific Northwest
Regional Council
of Carpenters
Representing more than 5.000
construction workers in Oregon State.
Do you want to know more about becoming a
Union carpenter?
November 13, 2013
The Portland Skanner Page 11