Portland observer. (Portland, Or.) 1970-current, October 31, 1990, Page 10, Image 10

Below is the OCR text representation for this newspapers page. It is also available as plain text as well as XML.

    * » X. K « * * * » * * • * ** » * ♦ *■ » • *’ » * *
■* \ \ « * I •
8* 10"”The Portland Observer-October 31,
i •* * • * ♦
’ « « * » • < « •> « <
, > t « > *
tr< <
1990
Measure 4 would
force the permanent
shutdown of Trojan«««
The economic costs of 4’s
shutdown would be enormous...
The environmental costs of 4 ’s
shutdown would be damaging...
“I’m voting NO on 4, and I know environmen­
talists throughout Oregon who are voting NO on 4
—because of the drastic environmental consequences
of replacing Trojan’s electricity with more fossil fuel
burning and more dams. Please join us in voting
NO on 4.”
“We already face a possible recession, higher energy
costs because ot the Mideast Crisis, federal tax
increases, and regional electricity shortages. It makes
no sense to shut down a reliable, low-cost, domestic
source ot electricity like Trojan.”
—Louisa Bateman
Oregon Environmental Council
Neuberger Award Winner;
Former Member, Oregon Fish and
Wildlife Commission
—Dr. Janies E. Reinmuth
Dean of the College of
Business Administration
University of Oregon
Measure 4 would immediately force the complete shut­
down of Trojan on December 6, 1990—forcing consumers
to pay billions of dollars in higher electric rates.
, *
If 4 passes, w e’d have to pay for higher-priced power sources to replace
Trojan’s electricity, forcing higher electric rates.
According to the Northwest Power Planning Council, Measure 4’s shutdown
would ultimately cost consumers as much as $3 billion.
,
■ .rr.M »»
L-’l
< .•
-
Measure 4’s shutdown of Trojan would mean shutting
down a plant that produces as much as 20% of Oregon’s
electricity—at a time when we already face tightening
electricity supplies.
An analysis released by the Bonneville Power Administration on
O ctober 22, 1990 concluded that the shutdown of Trojan would seriously
increase the possibility of regional electricity shortages — including “a
complete area blackout” — during the cold winter months.
The NO on 4 Committee:
•i
3
»
Shutting down Trojan would increase pressure to dam up
our free-flowing rivers and streams — destroying impor­
tant fish populations and wildlife habitats.
Closing Trojan would also greatly increase the pressure to build new' dams
on our region’s last remaining free-flowing rivers and streams.
This would destroy important fish populations and crucial wildlife habitats
we’ve worked hard to protect.
A partial list of over 40,000 members...
Dr. Alan H. Robinson
Jim Williams
Dr. Dwight A. Sangrey
Head, N uclear Engineering
D epartm ent
O regon State University
President
O regon Trout
Professor, Environm ental Science
and Engineering
President, O regon G raduate Institute
of Science and Technology
Dr. Cyrus W . Field
President
Associated O regon Industries
Richard M. Butrick
C hairm an, D epartm ent of G eosciences
O regon State University
Dr. Anna S. Gail, M.D.
Radiologist
Dr. K enneth S. Krane
Chairm an, D epartm ent of Physics
O regon State University
Dr. William L. Toffler, M.D.
Assistant Professor,
D epartm ent o f Family M edicine
O regon H ealth Sciences University
Dr. D orin S. Daniels, M.D.
Jean K. Young
r
This would pump an additional 6 billion pounds of carbon dioxide into the
air every year — adding to the global-warming Greenhouse Effect.
Leading O regon Environmentalist
Recipient o f the O regon Environmental
C ouncil’s Distinguished Environmental
Service Award, 1989
C hair and Professor, Geology D epartm ent
Portland State University
f
It would take two coal plants, burning 3 million tons of coal each year to
equal Trojan’s yearly electricity output.
Vem Rifer
Dr. Ansel G. Johnson
È
Measure 4’s shutdown of Trojan would force increased
burning of coal, gas, and oil to produce electricity —
causing more air pollution and adding to the Greenhouse
Effect.
Senior A dvocate
Former Mayor ot King City
Family Practice
Previous C hairm an,
O regon H ealth Council
Don G odard
John D. Foster
Manager, Canby Utility Board, Former
M em ber, N orthw est Power Planning Council
Board M em ber, Rogue Valley
A u dubon Society
William Q. Wick
Dr. Jane Gray
Professor ot W ildlife Ecology
O regon State University
Professor ot Biology
University o f O regon
Al B a te m a n
Board M em ber
O regon Trout
N euberger Environmental
Award W inner
Roger Ham ilton
M em ber, O regon Parks
Recreation Com m ission
William Funk
Will H. Brown
Professor, Environm ental
Law Faculty
N orthw estern School ot Law
Lewis <S l Clark College
President, Save T h e Minam
Board M em ber, G rande R onde
Natural Resource Council
G e ra ld W . H e rrm a n n
Executive D irector
Association for Environmental
Education C enters
M ember, O regon Fish N. Wildlife
C om m ission
Fom ier M em ber, O regon
Energy Facility Siting Council
Ja n e t M c L e n n a n
Assistant to G overnor for
Natural Resources, 1975-79
R oy B o w d e n
Executive D irector
Association ot N orthw est
Steelheaders
I’hil Schneider
Dr. Mary L. Taylor
Associate Professor
Biology/Environm ental Sciences
Portland State University
i T l t k s a n t i ( l / f ll h lt K I I b /(IT k i n i t l / k u f l l l t l
/mr/ioso (miy.)
Stop the Shutdown of Trojan's electricity
Vote NO on 4
A uthorized by the N O on 4 C om m ittee, 621 SW Alder, Portland, O R 97205
!
i
Í
»
4
■ ■
-■