Portland observer. (Portland, Or.) 1970-current, August 29, 1990, Page 13, Image 13

Below is the OCR text representation for this newspapers page. It is also available as plain text as well as XML.

    August 2 9 ,1990- -The Portland Observer—Page 11
POMand Observer
CLASSIFIEDS
NOTICE OF INTENT
1 he Oregon Department of Transportation, Highway Division, is seeking pro­
posals from qualified consultants to develop and implement a more effective
computer software package to perform computations involved in Cost Respon­
sibility Studies for road user taxation. This contract will consist of two phases.
The first phase involves an evaluation of existing software, an investigation of
desirable changes, and the submission of a proposal identifying options and a
recommended course of action. Upon the approval of the Division of the rec­
ommended course of action, the second phase will be initiated involving devel­
opment and implementation oi the software. The estimated cost for Phase 1 and
2 range from $80,000 to $100,000.
If you are interested in being considered, a Request for Proposal can be obtained
by calling or writing Bob Thompson, Consultant Liaison Engineer, 307 Trans­
portation Building, Salem, OR 97310; telephone (503) 378-6563.
Proposals are due September 12,1990.
MFIA INC.CONSULTING ENGINEERS
‘ ‘The State Board of Higher Education invites bids for Storage/Landscap-
ing Maintenance Facility Expansion at Eastern Oregon State College, La-
Grande, Oregon. Bids will be received at Eastern Oregon State College,
LaGrande, Oregon, in the officeof Mr. J.C. Lundy, Dean of Administration and
opened at 2:00 P.M. PDT, September 11, 1990. Plans and Specifications are
available to prime bidders only upon deposit of $25.00 from MFIA, Inc., 2007
S.E. Ash St., Portland, OR 97214. Bids received August 23, 1990 have been
disallowed.”
Associate Planner
The Port of Portland has an opening for an Associate Planner working under the
direction of a senior planner/project manager to provide support to Port de­
partments in developing a variety of planning projects and studies.
The successful candidate will be responsible for:
•Assembling and/or updating informa tion.
•Reviewing site plans.
•Performing site selection analysis and preparing site plans.
•Preparing reports evaluating land use planning and site development prob­
lems.
•Preparing applications for conditional use permits, zone changes, street vaca­
tions, etc.
•Assisting in developing, updating and implementing master plans and devel­
opment standards for Port Industrial/commercial properties.
Preferred qualification include:
•Course work or experience in land use planning.
•Experience in site development planning, preferable on a CAD system.
In addition to a starting salary range of $25,337 to $28,975, commensurate with
experience, the Port offers a comprehensive benefit package.
If interested and qualified, apply in person at the P ort of P ortland Em ploy­
ment Office, 700 N.E. M ultnom ah, 14th Floor. Applicants residing out­
side the tri-county, Portland metropolitan area, Clark County, and physically
disabled applicants may request application materials by calling (503) 231-
5000, ext. 700. All applications must be received by Friday, August 31,1990,
at 5:00 p.m.
The Port is an Equal Opportunity Employer
Port of Portland
©
700 N.E. Multnomah
P.O. Box 3529
Portland, OR 9720Ö
NOTICE OF INTENT
1
The Oregon Department o f Transportation, Highway Division, Planning
Section, requests Statement of Qualifications from interested consulting firms
to perform a major needs assessment and financial study for Oregon’s roads for
the years 1993-2013. This study will detail road needs in all areas of road
funding: construction and expansion, repair and preservation, and operations
and maintenance. The study will be approximately 15 months in duration with
various interim products necessary. The estimated cost of this study is in the
$1 million range.
If you are interested in being considered, a Request for Qualifications can
be obtained by calling or writing Tim H. Thex, P.E., Planning Analysis
Engineer, Oregon State Transportation Department, Highway Division, Plan­
ning Section, 325 13th Street NE, Room 605, Salem, OR 97310; telephone
(503) 378-3707.
Statement of Qualification are due August 31, 1990.
POSITION OPEN
Teen Parent Dept. Coordinator
Apply:
AMA Family
Day and Night Care
1425 NE Dekum
285-0588
285-0493 or
Send resume to:
PO Box 11243
Portland, OR 97211
Must have own transportation and experience in working with
teenagers. Closes August 31, 1990.
SUB-BIDS REQUESTED
OREGON MUSEUM OF SCIENCE 4 INDUSTRY
Holladay Park Medical Center
■
ItC A C V
1225 Northeast 2nd Avenue
(503) 233-4567
HruÄhSv^rwi
C om m itted to Career O pportunity J o r A U Americans
24-Hour Job Line 239-3116
An Equal O pportunity Employer
A Legacy Member
MENTAL HEALTH
Community Mental Health Center seeks
a master’s level therapist skilled in
short-term therapy forCM I; personal­
ity disorder, adult children of alcohol­
ics, dual diagnosis, situational prob­
lems and crisis recidivist clients. Fa­
miliarity with AFS, and entrepreneurial
spirit desirable. Competitive salary and
benefits.
Resume to:
Gary McConahay, Ph.D.
N/NE Community Mental Health,
Inc.
4950 N.E. Martin Luther King Jr.
Blvd.
Portland, OR 97211
Closing - August 24,1990
Minorities Encouraged to Apply
EOE
INVITATION TO CONTRACTORS
REQUEST FOR NEGOTIATED PROPOSALS
-S ITE WO RK—
The Housing Authority of Portland (HAP) is requesting proposals to
construct sitework at the Hillsdale Terrace Apartments, located at 6775 S.W.
26th Avenue, Portland, OR. Proposals will be received at the HAP Mainte­
nance Office, 8910 N. Woolsey Avenue, Portland, OR 97203, until 4:30 p.m.,
Tuesday, September 18,1990. After completion of a seven (7) day assessment
and evaluation period, a contract award will be made to the responsible offeror,
price and criterion factors considered, whose proposal is most advantageous to
HAP. A 100% performance and payment bond will be required of the
successful proponent.
Basically, the work consists of site demolition and construction of stairs,
landings, walkways, handrails, retaining walls, lighting, drain facilities and
landscaping. Total costs to consider for construction is $400,000. Criterion to
consider in the development of the proposal is outlined for proponents review
and is contained in the instructions to contractors in the project manual.
Interested proponents may obtain one set of construction documents at the
HAP Maintenance Office, mentioned above, upon receipt of $75 deposit which
is refundable when documents are returned in good condition within 10 days
after notice of award. Additional sets may be acquired for $40 each which is
non-refundable.
A HAP representative will conduct a tour of the project commencing at
10:00 a.rn., Thursday, September 6,1990, and the attendance of proponents is
requested. Interested parties should meet at the HAP Maintenance Office noted
above for instructions and orientation prior to the tour. Questions posed at that
time, when not addressed in the project manual will be clarified by addendum
and mailed to all proponents.
Attention is called to the provisions addressed in Division H “ Special
Conditions,” regarding Equal Employment Opportunity, a minimum of 20%
MBE participation, EEO compliance reports, certification of non-segregated
facilities and a waiver from enforcing the payment of nonfederal prevailing
wages when said wagers, exclusive of any fringe benefits, exceeds the appli­
cable wage rate determined by the Secretary of HUD.
The Housing Authority of Portland may reject any offer not in compliance
with the prescribed procedures and may reject any or all proposals and waive
all informalities if, in the judgment of HAP, it is in the public interest to do so.
Questions regarding this project should be directed to Dave Walter at 283-
1693.
HOUSING AUTHORITY OF PORTLAND
Loren Tarbell
Director of Maintenance
PUBLIC NOTICE
City of Portland Development Commission
REQUEST FOR PROPOSALS
(Bid #91-3)
ARCHITECT’S SERVICES FOR THE SHORELINE HOTEL SRO
REHAB
PORTLAND, OREGON
Proposals are due 3:00 p.m. Wednesday, September 12,1990.
The Portland Development Commission (PDC) is soliciting architectural
firms to submit proposals to provide architectural and engineering services for
the rehabilitation and historic preservation of the Shoreline Hotel building
located on the northeast comer of West Burnside and NW Second Avenues (4-
12 NW 2nd Ave.) in the Skidmore Historic District of “ Old Town” in Portland,
Oregon.
The work consists of remodeling portions of the existing building to
accommodate approximately 62 single room occupancy low-income living
units and ancillary uses, and work incidental thereto.
The Portland Development Commission is committed to acting affirma­
tively to encourage and facilitate the participation of Emerging Small Busi­
nesses (ESB), Minority Business Enterprises (MBE), and Women Business
Enterprises (WBE) in Commission projects and operations. Responsible bid­
ders must comply with established goals in this project.
A copy of the Request for Proposal for Architectural Services for Shoreline
Hotel SRO rehabilitation will be available by 3:00 p.m., Thursday, August 30,
1990, at Portland Development Commission, 1120 SW 5th Avenue, Suite 1100
(11th Floor) from Tony Poneck (503) 796-5352. Firms desiring to submit
proposals must obtain this document which contains the requirements for
submission, specific project information, scope of services required, contract
requirements and architect selection process.
Proposals must be submitted to the Commission no later than 3:00, p.m.,
Wednesday, September 12, 1990.
ANDERSEN CONSTRUCTION CO., INC.
S upport o u r A d v e rtis e rs -
SA Y Y O U S A W I T IN
THE PORTLAND OBSERVER
Employment
CITY OF PORTLAND
Police Officer - to $3.217/mo.
Director of Environmental Services - $68,328/year
Assistant Management Auditor - $2,659/mo.
Laboratory Manager - $43,326/year
Mechanical Inspector - $3,068/mo.
Loss Control Supervisor-$3,846/mo
For more info./closing dates, call (503) 248-4573 (24 hour job information). No
resumes please.
BUREAU OF PERSONNEL
1220 S.W. Fifth Avenue, First floor
Portland, OR 97204
Apps. also available at:
URBAN LEAGUE
10 N. Russell
Minorities, females and disabled encouraged to apply.
REQUEST FOR PROPOSAL
TO PROVIDE PROFESSIONAL CONSULTING ENGINEERING
SERVICES FOR ANALYSIS OF WATER QUALITY BASED LIMITS
ON WASTEWATER TREATMENT PLANT EFFLUENT
Background
The City of Gresham Wastewater Treatment Plant (WWTP) treats
approximately 10 mgd dry weather flow and manages an EPA-approved
pretreatment program. Current regulatory emphasis on water quality based
standards for receiving waters raises issues regarding what impact present and
future regulations may have on the operation of the WWTP. The City,
therefore, seeks a consultant to provide an analysis and recommendations
regarding these issues.
Proposal
Proposals must be submitted by 5:00 PM, Pacific Daylight Time, Septem­
ber 26, 1990. Proposals must include task details describing the work to be
done under each task, hours by professional category for each task, estimate
of cost by task, and project schedule by task.
The consultant should include in his proposal the following items:
1. The name and resumes of the Project Manager, Project Engineer, and
all key personnel for the project
2. The firm name and key personnel of any subconsultants on this Project.
Also, list this firm’s qualifications for the proposed work.
3. Firm’s background with similar type of projects in the past. The firm ’s
capability to complete all phases of the project within the time schedule.
4. The name, address, and telephone number of the person who will be the
contact on firm ’s behalf and to whom all correspondence will be sent.
5. Firm’s approach to Project.
6. Project schedule.
7. Estimated co st
Proposals would be no more than five pages excluding standard firm
brochures.
Scope of work
The scope of work includes the following:
1. Perform whole effluent toxicity (WET) testing on WWTP effluent
using approved laboratory procedures. Determine concentrations, duration,
and frequency of WET testing necessary to begin building a database of
effluent toxicity.
2. Perform analysis of the WWTP outfall, resulting in technically-based
determination o f the mixing zone and zone of initial dilution as they relate to
water quality based discharge limits. Evaluate adequacy of outfall pipe to
provide mixing and assess potential need for high rate diffuser or alternative
location.
3. Determine the possible impacts of water quality based limits on the
NPDES renewal process and the current industrial pretreatment program.
Evaluation of Proposals
The proposals will be evaluated on the following criteria:
1. Conceptual understanding of the project as demonstrated in the
proposal.
2. Firm ’s resources and capability to compete work in a timely manner.
3. Firm’s experience and expertise for the type o f services required.
4. Proposed fees vs. proposed staffing and services.
A consultant evaluation committee will make recommendations to the
City Engineer. The selected consultant will be asked to negotiate an agree­
ment with the City. In the event that negotiations are unsuccessful, the next
ranking consultant will be selected for negotiations. The negotiated agree­
ment will be on an hourly rate basis with a “ not-to-exceed” cost lim it
Technical questions regarding this proposal may be directed to the City
of Gresham Engineering Division.
Timothy Otis, P.E.
Civil Engineer
(503) 669-2431
or
Garry Ott, P.E.
Sanitary Engineer
(503) 669-2438
The City of Gresham’s programs, services, employment opportunities
and volunteer positions are open to all persons without regard to race, religion,
color, national origin, sex age, marital status, handicap or political affiliation.
METROPOLITAN SERVICE DISTRICT
PROFESSIONAL
TECHNICAL SERVICES
REQUEST FOR PROPOSALS
PROPOSALS DUE SEPTEMBER 12,1990
The Planning and Development Department of the Metropolitan Service
District (METRO) is requesting proposals for digitizing the Soil Conservation
service (SCS) maps for Washington County, Oregon. Soil polygon lines, open
water boundaries, and survey boundaries will be digitized and each polygon
will be labeled. Each map sheet will be edge-matched with adjoining sections
to form a 7.5' quadrant map unit.
The RFP is available at:
Metropolitan Service District
Planning and Development Department
2000 S.W. First Avenue
Portland, Oregon 97201-5398
Portland, Oregon
Bid Date: August 29, 1990 @ 3:00 PDT
6712 N. Cutter Circle
Portland, OR 97217
(503) 283-6712
FAX: (503) 283-3607
We are an equal opportunity employer and request sub-bids from disadvan­
taged, minority, women, and emerging small business enterprises.
Oregon Contractor’s Board Registration #630532
»Advertising
»Employment
h Blds/Sub-Blds
REE Enterprises
P.O. Box 11052
Portland, OR 97211-0052
Specializing in landscaping, janitorial, and maintenance
services
CALL MICHAEL DAVIS for a Free Estimate at 281-2661
24 hour service 281-0174
Questions may be directed to Jim Morgan at (503)221-1646.
Proposals arc to be submitted no later than 5:00 p.m., Septem ber 12,1990.
SOCIAL SERVICES
AGENCY COUNSELOR
Part-time, for birthparent services, in­
cluding preadoption planning, grief
counseling, pre & post placement
services. Masters degree in Social
work or related field experience.
Familiarity with psycho-social dy­
namics of adoption triad & current
trends in adoption, including open­
ness. Salary (part-time) $9,000-
$12,000 D O E . Apply a t2301 NW W
Glisan, Portland, O R , or call 222.
9661 ext. 277 for application. Equal
Opportunity Employer.