INVITATION FOR PROPOSALS* ADVERTISEM
Invitation To Bid
Call For Bids
SUPPLY ONE 111 STRUC TU RAL PLATE ARCH
Sealed bide tor the Supply of One 111 Structural Plate Arch. Solicitation N o .
R®-3-83-71s, will be received until 11:00 a.m ., local time, on May 16, 1983,
by the Contracting Officer, Gifford Pmchot National Forest, 600 West 12th
Street, Vancouver, W ashington 98680. The Solicitation may be secured
from this address or by calling the Contracting O fficer at 1206) 696-7537.
Arch shall meet the requirements of A A S H T O M 167 Delivery, unloading
and stockpiling at designated delivery point shall be the responsibility of the
Contractor
Call For Bids
Sealed bids tor the Staking of Treatment Areas and Manual Application of
Chemical tor Site Preparation. IFB No. R6 3 83 73s, will be received until
10:00 a .m ., local time. M ay 23, 1983, by the Contracting Officer, Gifford
Pinchot National Forest, 600 W est 12th Street, Vancouver. W ashington
98660 The IFB may be secured from the Contracting Officer at the above
address
CITY OF SHERIDAN
CONSTRUCTIO N
Bids due 4 : X p.m ., May 17
Sealed Proposals for the Construction of the West Main Collection System
and N orthside R ehabilitatio n , addressed to the City Recorder. C ity of
Sheridan. 139 N W Yamhill S t., Sheridan. Oregon 97378. until 4:30 p m .,
local time, on the 17th day of May 1963, and then will be publicly opened
and read.
The Work contemplated is as follows:
S C H E D U L E A: Construction of the Sewage Collection system serving the
W esi Main Area including 12,025 linear feet of 8 and 10 inch sewer pipe,
1,920 linear feet of 6-mch pressure pipe. 2,760 linear feet of 4 and 6-inch
service pipe, manholes, surface restoration, 3 railroad undercrossings, one
(11 W et W ell mounted type pump station, and other appurtenances
SCHEDULE B: Construction of a replacement Sewage Collection system
on the Northside of the City of Sheridan, including 2,476 linear feet of 12
and 15 inch sewer pipe, /60 linear feet of 4 and 6-inch service pipe, m an
holes, surface restoration, 12 connections of the existing mainline system
to the replacement line, 51 connections of existing 4 and 6-inch service
connections to the replacement line, and other appurtenances
SCHEDULE D: Construction of a relocated waterline serving the West Main
Area, including 6,096 linear feet of 6 and 8 inch water pipe, % to 1 H -inch
service connection pipe. 3 connections of the existing mainline system to
the relocated line, 31 connections of existing water service connections to
the replacement line, one (1) railroad undercrossing, valves, fittings, hydrant
installation, surface restoration, and other appurtenances
Plans and specifications m ay be exam ined at the o ffic e of Consultants
Northw est. In c ., 117 East Fifth Avenue, M cM in nville. Oregon 97128. A
copy of said documents may be obtained at the Consultant's office upon
payment of »50.00 for each document. The full amount of the payment is
nonrefundable.
Bidders must be prequalified in compliance with applicable parts of Chapter
279 of Oregon Revised Statutes Prequalification forms, completely filled
out should be subm itted to the City Clerk, City of Sheridan. 139 N .W .
Yamhill Street, Sheridan, Oregon 97378 at least ten (101 days prior to the
bidding date. The Owner will issue proposal forms to Qualified Bidders
No proposal will be received or considered by the City of Sheridan or any
officer of the City unless the proposal contains a statement by the bidder as
a part of his proposal that the provisions required by ORS 279 350 shall be
included in his contract.
Before a Contract will be awarded for the work contemplated herein, the
Owner will conduct such investigation as is necessary to determine the per
formance record and ability of the apparent low bidder to perform the size
and type of work specified under this Contract. Upon request, the Bidder
shall submit such information as deemed necessary by the Owner to evaluate
the Bidder's qualifications.
Each proposal must be submitted on the prescribed form and accompanied
by a certified check or bid bond executed on the prescribed form, payable
to the City of Sheridan, Yamhill County, Oregon, in an am ount not less
than 10 percent of the amount bid.
The work contemplated consists of clearing and grubbing a portion of the
site of the sewage treatment plant, preloading w ith approximately 80,000
cubic yards of importad granular fill matarial. off site disposal of unsuitable
material, and installation of settlement plates
Drawings and Specifications may be examined in the office of the Depart
ment of Environmental Services, 902 Abernethy Road. Oregon City. OR
97046, or at the offices of the Engineer. 1600 114th Avenue SE. Bellevue.
W A 96004; or 2020 S W 4th Street. 2nd Floor. Portland. OR 97201.
A copy of the Documents may be obtained at the Department of Environ
mental Services office upon payment of »20 for each Document. Return of
the Documents is not required, and the amount paid for the Documents is
nonrefundable
Builders Exchange Co-op
1125 SE Madison
Portland, OR 97214
Northwest Plan Center
901 SE Oak Street
Portland. OR 97214
Contractors must be qualified in accordance w ith the applicable parts of
ORS 279 in order to enter into a Contract with the Owner for public work in
Oregon.
Bidders who are not currently prequalified by the Owner to perform the type
and size of work contemplated herein shall submit a completely executed
Contractor s Prequalification Application to the O wner prior to, or at the
time of bid opening.
Bidders on this work will be required to comply w ith the provisions of the
President s Executive Order N o. 11246 concerning equal em plo ym en t
The Bidder s attention is directed to the provisions of these Documents that
relate to the utilization of minority business enterprises during the perfor
mance period of the Contract. The Environmental Protection Agency Region
X has adopted the following goals for this Contract:
Ten to fifteen percent of construction w ork (on a dollar basis) shall be
performed by minority subcontractors.
Ten to fifteen percent o f construction supplies and m aterials shall be
procured from minority-owned suppliers.
Prior to award of a contract. EPA will review the proposala with respect to
the Bidder s degree of compliance with the above goals; a low bidder who
has not achieved these goals must demonstrate to the satisfaction of the
Director, Office of Civil Rights and Urban Affairs. EPA Region X, that the
goals are not attainable on the Contract work.
Any contract awarded under this Invitation to Bid is expected to be funded
in part by a grant from the United States Environmental Protection Agency.
Neither the United States nor any of its departments, agencies, or employ
ees is or will be a party to this Invitation to Bid or any resulting Contract.
This procurement will be subject to regulations contained in 40 CFR 35 936
36 938, and 36 939
The right is reserved to reject all Proposals or any Proposal not conforming
to the intent and purpose of the Contract Documents, and to postpone the
award of the Contract for a period of time which, however, shall not extend
beyond 90 days from the bid opening date.
For information concerning the proposed work, or for appointment to visit
the site of the proposed work, contact C .F. Liebert. Program M anager
telephone 503 666 8521
'
Dated this 18th day of April, 1983
BOARD OF CO U N TY C O M M ISSIO N ER S
C LAC KAM A S CO UN TY, OREGON
Robert Schumacher, Chairman
Ralph Groener, Commissioner
Dale Harlan, Commissioner
Invitation For Bids
Sealed bids will be received until 2:00 p.m . (local time), May 9, 1983, at the
office of W alker b M acy, Landscape Architects. 222 N .W . Davis Street.
Suite 300, Portland. Oregon 97209, for site and electrical work required for
Phase One: Campus Improvements South of Lausanne Hall at W illam ette
University, Salem, Oregon.
Proposed work includes underground electrical, lighting and switchgear,
walkways, millrace improvements w ith new pedestrian bridge, concrete
and masonry construction, lawns, plantings and underground irrigation.
Bid documents, including plans and specifications are to be isaued at the
office of Walker b Macy beginning M onday, April 18, ,983. A deposit of
»50 00 per set of contract drawings is required. Tw o sets maximum will be
issued to any one prim e bidder. A d d itio nal sets or partial sets m ay be
purchased for the cost of reproduction.
A pre bid conference is scheduled for Friday, April 29, 1983. 10:00 a.m .
(local time) at W illamette University, Putnam Center, in the Harrison Con
ference Room
DATED this 20th day of April, 1983
CITY OF SHERIDAN
By GARY HARRISON
Mayor
Published April 27. 1983
Plans, specifications and other bid documents may be inspected and obtained
at the office of the City of Salem, Department of Public Works. 655 Liberty
Street S.E.. Room 325, Salem, Oregon. The bidder shall not file the book of
"Standard Construction Specifications" with his bid.
Bids shall be made on the forms furnished by the City, addressed, and mailed
or delivered to the City Recorder, City Hall. Room 206, Salem. Oregon, in a
sealed envelope plainly m arkad " B ID O N THE EVERG REEN A V E N U E
STREET IM PR O VEM EN T", and the name and addresa of the bidder.
A surety bond, ca sh ier’s check or ce rtifie d check of the bidder, m ade
payable to the City of Salem, in the amount of ten percent (10% ) of the bid
must accompany each bid as security. Bid security of all save the three
lowest bidders will be returned following the bid opening; all bid security will
be refunded upon execution of the contract by the successful bidder
No bid will be received or considered by the City of Salem unless the bid
contains a statement by the bidder that the provisions of ORS 279 350 shall
be included in his contract.
Prequalification Class: Asphalt Concrete Pavem ent b Portland Cem ent
Pavement
The project is to be assisted, in whole or in part, with Federal Funds made
available under Title I of the Housing and Comm unity Development A ct of
1974. The provisions of Executive Order 11246, as am ended, require the
cooperation of bidders, contractors, sub contractors and proposed sub
contractors in the administration of the compliance with equal employment
opportunity and affirmative action requirements. Prospective bidders may
direct inquiries concerning these requirements to the office mentioned above
where plans and bid obtained. In addition, attendance at pre bid, pre award
a n d /o r pre-construction conference m ay be required to discuss specific
requirements and programs for compliance.
Pat W olfe
City Recorder
Bid No. 2446
Bid Opening: M ay 11, 1983
Advertisement For Bids
CITY OF W ILSO NVILLE
LID « 4 - K IN S M A N ROAD
Bids due 2:00 p .m ., M ay 6
Before a Contract will be awarded, compliance with all EPA requirements
specified in the Contract Docum ents will be subject to EPA review and
approval
Any Contract awarded under this Invitation to Bid is expected to be funded
in part by a grant from the United States Housing and Urban Development
Agency. Neither the United States nor any of its departments, agencies, or
employees is or will be a party to this Invitation to Bid or any resultina
Contract.
The Owner reserves the right to reject any or all Proposals or any Proposal
not conforming to the intent and purpose of the Contract Documents and
to postpone the award of the Contract for a period of time which, however
shall not extend beyond 46 days from the bid opening date
The proposed w ork consists of: The construction o f 1470 linear feet of
roadbed grad.ng, base rock, alternate Portland Cement Concrete Pavement
or Asphaltic Concrete Pavement surface, and performance of such additional
incidental work as is called for by the plans and specifications.
A w ard of co n tract w ill be subject to p ro ject surviving p ro perty o w n er
remonstrance.
W ILLAM ETTE UN IVERSITY
C A M PU S IM PRO VEM ENTS
Bids due 2:00 p .m ., May 9
f or information concerning the proposed work, or for appointment to visit
the site of the proposed work, contact Consultants Northwest. Inc telephone
603 472 7926
Sealed bids will be received at the office of the City Recorder, Room 206,
City Hall. Salem, Oregon, until but not after 11:00 4 ,m ., Local Time on M ay
11. 1983. at which time all bids will be publicly opened and reed aloud at the
Council Chambers. Civic Center. 556 Liberty Street S .E .. Salem, Oregon,
for th e C O N S T R U C T IO N OF THE EVERG REEN A V E N U E S T R E E T IM
PROVEMENT SO UTH OF CHESTER TO S U N N Y V IE W ROAD
The attention of Bidders is directed to the requirements and conditions of
employment to be observed and minimum wage rates to be paid under the
contract.
The attention of Bidders is directed to the federal and state government
Bflfore a Conti act will be awarded, compliance with all EPA and H U D require
FOR THE CO N STR U C TIO N OF THE
EVERGREEN AVENUE STREET IM PRO VEM ENT
SO UTH OF CHESTER TO S U N N Y V IE W ROAD
No bid shall be received from any bidder who has not filed a prequalification
statem ent w ith the City Purchasing Supervisor, 1340 20th Street S .E .,
Salem, Oregon 97301, on or before M ay 6. 1983.
requirements and conditions of employment to be observed and minimum
wage rates to be paid under the Contract.
ments specified in the Contract Documents will be subject to EPA and HUD
review and approval
C ITY OF SALEM . OREGON
DEPA RTM ENT OF PUBLIC W O R K S
D EPA RTM ENT OF GENERAL SERVICES
opportunity, including all amendments and requirements issued thereunder.
The requirements for Bidders and Contractors under this Order are explained
in the Contract Documents.
The succesaful bidder will be required to furnish a bond for faithful perfor
mance and payment of the contract as prescribed in the Contract Documents.
Bidders on this project will be required to comply with the provisions of the
President s Executive Order No. 11246 and requirements issued thereunder
The requirements for Bidders and Contractors under this Order are specified
in the Contract Documents.
Invitation To Bid
Sealed Proposals for the construction of Tri-City Service District. Sewage
Treatm ent Plant, Praload, C ontract C l. addrasaed to Board of County
Commissioners, Clackamas County, OR. will be received at the office of the
Department of Environmental Services. 902 Abernathy Road. Oregon City,
OR 97045, until 2:00 p .m ., local tim e, on the 17th day of M a y 1983, and
then will be publicly opened and read
The follow ing plan room services have obtained copies of the Contract
Documents for the work contemplated herein:
Invitation To Bid
lb s * INVITATIONS TO BID
Bid docum ents are available April 18. 1983, for inspection at: 1. Salem
Contractors' Exchange. 2256 Judson SE, Salem, Oregon. (503) 362-7957
2. Construction Data and News. 925 N W 12th, Portland. Oregon. (503)
225 0200; 3. Eugene Buildings Exchange. 145 East 29th Street. Eugene.
O regon, (503) 342 1116; 4. Builders' Exchange C o -o p e rative 1125 SE
Madison, Room 200, Portland. Oregon. (5031 234 0281
Published April 27, 1983
Sealed bids for the LID #4 — Kinsman Road Project will be received by the
City of Wilsonville until 2:00 p .m . local time on M ay 8, 1983 Bids will be
publicly opened and read aloud at th e above tim e and date at City Hall
Council Chambers, Wilsonville, Oregon.
Proposals shall be clearly marked "Bid for LID »4 - Kinsman Road" along
with time and date of bid opening and shall be delivered before the above
hour and date to City Hall. W laonville, Oregon 97070.
The work consists of the following construction Building 3800 feet of paved
and curbed street w ith w ater lines, storm sewers, bored RR crossings,
sanitary sewers, street lights, p o w er/ telephone trenching, sidewalk and
associated work.
Plans and Specifications may be examined at: City Hall, Wilsonville. OR.;
W estech Engineering. Inc., 3421 25th St. SE. Salem , OR 9 7 X 2 ; Salem
Contractors Exchange. 2256 Judson St. SE, Salem, OR 97302
Copies of the contract documents may be obtained from Westech Engineer
ing, In c ., upon deposit of tw e n ty -fiv e dollars (» 2 5 .0 0 ) fo r each set of
documents. The deposit will be refunded upon return of the documents in
good condition within three days after the bid opening
Bidders must be prequalified with the Owner in accordance with the laws of
the S tate of O regon. Com pleted prequalification form s and supporting
documentation must be received by W estech Engineering at least five (5)
days prior to the bid opening. Only bids from prequalified bidders shall be
opened.
All proposals shall be made on proposal forms to be issued to prequalified
bidders All proposals shall be accom panied by a bid bond equal to ten
percent (10 % ) of the total bid, to be forfeited to the Owner in the event of
failure of the Contractor to execute the contract. A one hundred percent
1100%) performance bond will be required to guarantee the faithful perfor
mance of the contract.
The Owner reserves the right to reject any or all bids, to postpone the award
for X days, to delete certain items from the proposal, and to aw ard the
contract to the lowest possible bidder.
Published April 27, 1983.
CITY OF W ILSO NVILLE. OR