Portland observer. (Portland, Or.) 1970-current, January 11, 1979, Page 6, Image 6

Below is the OCR text representation for this newspapers page. It is also available as plain text as well as XML.

    Page 6 Portland Observer Thursday. January 11.
W t
IN V IT A T IO N T O B ID
O N E Q U IP M E N T TO BE F U R N IS H E D
C ITY OF B E N D . O R E G O N
The City of Bend Deschutes County. OR hereinafter ceiled the Owner, through
BECON. hereinafter called the Engineer <s inviting separate Proposals to furnish
and deliver the following equipment:
Contract No. 9: 15KW and 46 KW Trailer Mounted Generator Sets
Contract No 23 Foul Air Scrubber System
N O T IC E T O C O N T R A C T O R S
NOTICE TO CONTRACTORS
Sealed bids for the construction of an improved sewerage collection network for
the City of Reedsport. Douglas County. Oregon, will be received by the City
Recorder at the City Hal,. Reedsport Oregon, will be received by the City Rscor­
er at the City H a l. Reedsport. Oregon until 2:00 P .M ., P .S .T . on February 20.
1979. Bids submitted prior to the opening day may be delivered to H .G .E .. Inc ,
19 Northwest Fifth. Portland. Oregon. Bid opening will be conducted at the City
Had. Reedsport. Oregon and pubhcfy opened and read aloud at 2:00 P .M . Bids
wdl be tabulated and prepared for a special Council Meeting to ba held at 8:00
P .M .. on February 26. 1979 in the Council Chambers of the City Hall, Reedsport,
Oregon.
Seated bids for the expansion of Wastewater Treatment Plant Facilities and three
<31 pump stations for the City of Reedsport. Douglas County, Oregon, will be
received by the City Recorder. City Had, Reedsport, Oregonn. until 2:00 Pm.,
P .S .T . on February 20. 1979. Bids submitted prior to opening day may be
delivered to H .G .E. Inc.. 19 Northwest Fifth, Portland. Oregon. Bid opening will
be conducted at the Reedsport City HaH, 461 Winchester Avenue. Reedsport,
Oregon, and publicly opened and read aloud at 2:06 P .M . P .S .T. Bids will be
tabulated and prepared for a special Council Meeting to be held at 8:00 P M .
February 26, 1979, at the Council Chambers. City Hall. Reedsport
The project has bean divided into tw o schedules for bidding purposes
Sealed Proposals addressed to James W Kertoot, Recorder-T r o u t e r of the
City of Bend. Deschutes County. 710 Wall Street. Bend. OR 97701, will be
received at the office of James W . Kertoot. Recorder-Treasurer of the City of
Bend 7 ,0 Wa„ Street Bend. OR 97701. until 9 30 a m ., local time, on the 9th
day of February 1979. at which time they wdi be pubhcfy opened and reed m the
City Commission Room at 720 Wall Street, Bend. OR 97701.
The project has been divided into tw o schedules for bidding purposes. Schedule
"A” contains work required for the rehabilitation of approximately 40.000 lineal
feet of 6" to 21" sanitary sewer lines Schedule B contains work required for
the construction of 11,600 'meal feet of new storm drain and sanitary sewer lines,
from 8" to 27". Schedules " A " and "B may be awarded to one contractor or
separately to tw o contractors
The Contract Documents for the Owner s purchase of equipment include the
Bidding Requirements the Proposal the Contract forms the General Con­
ditions the Supplementary Conditions, the Specifications, and the Plans Copies
of the Contract Documents may be reviewed or obtained at the office of BECON
(Benq Engineering Consultants), South Highway 97 Bend. OR 97701 A TTEN ­
TION Mr Scott Hicks. Phone <503, 382-4114. Questions about the content of
these Contract Documents should be directed to Mr. Scott Hicks, BECON, P.O .
Box 1174. Bend OR 97701. <5031 382-4114.
The major items included in each schedule are listed below:
Each Proposal must be accompanied by a certified check or B kj Bond executed
on the prescribed form, pavabie to the City of Benq. Deschutes County Oregon
in an amount not less than 10 percent of the amount bid
Prices quoted in the Proposal shall remain firm for a period of 90 days after the
date stated for opening of Proposals. At the Bidder s option, pnces quoted will
be subject to negotiation after said 90 days have elapsed
Complete descnptrve literature as required by the Contract Documents shall be
submitted with the Bidder s Proposal for the Engineer s review and evaluation
Pnces quoted she« be f o b factory with freight and fuM insurance paid by the
Bidder to the City of Bend. OR 97701
The successful Bidder for the fohowing Contract w R be required to furnish a Per
formance and Payment Bona for faithful performance of the Contract in the full
amount of the Contract price.
Bidders on this work w « be required to comply with the provisions of the
President s Executive Order No. 11246 and requirements issued thereunder. The
requirements for bidders and contractors under this order are explained m the
Contract Documents.
The right « reserved to reject any or ail Proposals for each bid item, and to con­
sider that Proposal for any individual item of equipment which is to the best in­
Dated this 9th day of January. 1979
CITY OF BEND, OREGON
By James W . Kertoot
Recorder Treasurer
Kennedy assassination
(Continued from page 1, col. 6)
frame of the Zapruder film — »here
this shot clearly occurs — the Presi-
dent’s head is unmistakeably snap­
ped with considerable energy to his
left and rear, as if hit from the right
and in front by a marksman standing
somewhere on the grassy knoll. This
head snap is so obvious on a
reasonably good print of the film
that its significance was brought to
the attention of authorities by
numerous citizens who sa» it.
While the head snap of the
Zapruder film indicated a frontal
shot, the official theory report
prepared by m ilitary doctors in
Bethesda. Maryland — after the
Parkland surgeons’ preliminary-
examination — concluded the op­
posite.
According
to
the
Bethesda doctors, whose findings
were subsequently accepted by both
the Parkland doctors and the W arren
Commission, Kennedy had been
struck by two bullets from behind.
Medical experts convened by the
House Assassination Committee, in
examining the medical evidence con­
tained in the National Archives, had
also concluded that it was incom­
patible with the theory of a frontal
wound of entrace.
Since 1964, experts in fact have
disagreed about the significance of
the head snap and have put forward
both ballistic and neuromuscular ex­
planations to reconcile a snap to the
rear with the theory of a shot from
the rear
Nonetheless, the fact that the
Commission knew of the head snap
yet never dealt with it reinforces
questions about how open-endedly it
pursued the possibility that a second
gunman was involved, shooting from
a position other than the School
Book Depository.
In general, the Warren Com­
mission’s evasiveness concerning the
case for a gunman on the grassy
knoll may well have been counter­
productive. Critics immediately
asked why many witnesses had never
been interviewed who in previous
statements had supported the grassy
knoll theory. They attacked as
misleading an Appendix to the
Report which strengthened the case
against Oswald by ruling out the
possibility of a gunman on the
railway bridge, without revealing
that most of the witnesses it cited had
actually argued in favor of a gunman
on the grassy knoll. Allegations of an
official cover-up in this area began
within months of the publication in
September 1964 o f the Warren
Report. They were strengthened as
bootleg prints of the Zapruder film
were screened, at first to college
audiences but eventually on national
television and to Congressmen and
their staffs.
Meanwile over the years
assassination researchers listened
carefully to private copies of the of­
ficial tapes of the two Dallas police
radio
channels
during
the
assassination. It was one of these
tapes on which a researcher claimed
to have detected as many as seven
shots that was forwarded to the
House Assassination Committee and
its acoustics experts. Although this
tape was eventually ruled to have no
evidentiary value, the Committee's
inquiries to the Dallas police depart­
ment resulted in the provision of
tapes and dictabelts of better quality
for analysis.
It was from acoustical analysis of
this material — analysis using simple
and straightforw ard techniques
available in 1963 — that experts now
have concluded, with 95 percent
probability, that a shot was indeed
fired from the grassy knoll.
Acceptance of this analysis may
well represent the most powerful im­
pact the science of acoustics has ever
had on human history.
(Peter Dale Scott. a professor o f
English at the University o f Califor­
nia-Berkeley, has authored or edited
numerous articles and books on
covert politics, foreign and domestic,
including m ost recently "The
Assassinations: Dallas and Beyond"
(Random House, ¡976/ and "Crime
and Cover-up" (West works, ¡977).
He is one o f the foremost indepen­
dent researchers on the history o f the
Kennedy assassination. /
S C H E D U L E " A " - C O L LE C TIO N S Y S T E M R E H A B IL IT A T IO N
The major item included in each schedule are listed below:
1.
2.
3.
4.
5.
6
7.
8.
9.
10.
11.
12.
Sewer Cleaning................................................................................. 38.599L .F.
Television Inspection.......................................................................38,599 I.F .
Root Treatm ent................................. ...............................................9,000 L.F.
8* Polyethylene Liner...................... ................................................ 18,925 L.F.
10* Polyethylene Liner....................................................................2.990 L.F.
12" Polyethylene Liner...................................................................1.926 L.F.
15" Polyethylene Liner...................................................................2.316 L.F.
18" Polyethylene Liner....................................................................800 L.F.
Service Lateral R eplacem ent........................................................ 7.500 L.F.
Sewer Line Grouting........................................................................ 12.340 L.F.
Manhole Rehabilitation.................................................................. 36 Each
Asphaltic Concrete...........................................................................5,000 Tons
SCHEDULE
B * -
S T R U C T IO N
1.
2.
3.
4.
5.
6
7.
8.
9.
10.
11.
12.
13
File Early
Why file early when you » t g « until April
16 Ih n year lo mail your lax return lo the
IR S ’ Here are two good iea*>m
Firm, if you're expecting a refund, why
wait much longer than necexxary lo claim
and receive u ’ Norm ally, fewer people file
early in the year, jierm itting Internal
Revenue Service (enters »> pmtexx return»
STO RM
D R A IN A N D S A N IT A R Y S E W E R C O N ­
Excavation and Backfill....................................................................11,624 L.F.
12" Storm Drain............................................................................... 4.000 L.F.
15" Storm D rain...............................................................................1,125 L.F.
21" Storm Drain............................................................................... 345 L .r.
24" Storm Drain............................................................................... 1,390 L.F.
27" Storm Drain............................................................................... 50 L.F.
8" Sanitary S ew er............................................................................ 360 L.F.
10' Sanitary S ew er....................... - ............................................. .8 3 0 L.F.
12* Sanitary S ew er..........................................................................140 L.F.
18' Sanitary S ew er......................................................................... 345 L.F.
Manhole Construction..................................................................... 47 Each
Asphaltic Concrete...........................................................................4,000 Tons
10" Pressure Main ..........................................................................1,875 L.F.
H .G .E ., Inc..................................................................................... Coos Bay. Oregon
Builders Plan Exchange...............................................................Portland. Oregon
Northwest Plan Center ............................................................. Portland. Oregon
Construction Data News .......................................................... Portland. Oregon
Builders Plan Center.....................................................................Portland. Oiegon
United Minority Contractors...................................................... Portland. Oregon
Contractors Management Assn., Inc . . . . . . . . . . . . . . . . . . . . . . . . . . . Portland. Oregon
N .W . Minority Contractors Assn.............................................. Portland. Oregon
Bay Area Planning Exchange..................................................... Coos Bay, Oregon
Eugene Builders Exchange........................................................ Eugene. Oregon
Douglas County Building Exchange....................................... . Roseburg. Oregon
Salem Contractors Exchange..................................................... Salem, Oregon
Northwest Plan Center................................................................. Seattle. Washington
Northwest Minority Suppliers Assn.......................................... Seattle. Washington
One copy may be obtained by prequalrfied prospective bidders upon receipt of
cash or check in the amount of $50.00 made payable to the Engineer. Deposit
made upon procurement of drawings, specifications, and forms of Contract
documents will be refunded upon the return thereof in good condition by actual
bidders within ten (10) days after the opening of bids Non-bidders deposits will
be refunded if documents are returned, in good condition no later than 15 days
after the bid opening Deposits retained shall cover cost of printing. Individual
sheets and specification pages may be purchased for the cost of reproduction:
Drawings $1.00 per sheet; Specifications. $0 25 per sheet
Bidders must prequalify with Owner, on Standard Oregon Review Board Pre-
qualrfication Forms, ten 110) days poor to bid opening. Prequalification forms
may be obtained from the Engineer and should be submitted to the Owner via the
Engineer If a preaualrfication form is on file with the Engineer and is not over one
year old. refiling is not necessary unless there has been a substantial change in
Contractor's status
No bid will be considered unless fully completed in the manner provided m the
"Instructions to Bidders upon the bid form provided by the Engineer and ac­
companied by a bid bond executed in favor of the City of Reedsport m an amount
not less than ten percent (10% ) of the total amount of the bid. Bid bond is to be
♦orterted as a fixed and liquidated damage should the bidder neglect or refuse to
enter into a contract and provide suitable bond for the faithful performance of the
work in the event the contract is awarded to him. Funds for the improvement are
available, and monthly payments will be made by check.
No bids will be considered by the City of Reedsport or any officer thereof, unless
the bid contains a statement by the bidder as a part of his bid that the provisions
required by ORS 279 350 shall be included in this Contract
Schedule " A " — W astewater Treatment Plant
1. Expansion from 0.96 M G D to 1.92 M G D of an activated sludge wastewater
treatment plant, including construction of a headworks facility, aeration
basin, clarifier, digester, chlorine contact chamber and miscellaneous
equipment and piping.
2. 12" asbestos cement pressure line -
1,040 lineal feet
Schedule "B" — Pump Station Modifications
1. Modifications to three <3, sewage lift stations, including construction of two
structures, installation of vanable flow controllers, motors, pumps, elec
trica! work and standby power generation systems.
Plans and specifications are available only at the office of H .G .E., Inc., 19 N .W .
Fifth Avenue. Portland, Oregon 97209. and may be seen at the following
locations:
H .G .E ., Inc......................................................................................Coos Bay. Oregon
Builders Plan Exchange............................................................... Portland, Oregon
Northwest Plan Center................................................................ Portland. Oregon
Contractors Exchange................................................................. Salem, Oregon
Builders Plan Center..................................................................... Portland, Oregon
Contractors Management Assn., Inc.......................................Portland, Oregon
United Minority Contractors.......................................................Portland. Oregon
N .W . Minority Contractors Assn.............................................. Portland. Oregon
Salem Contractors Exchange....................................................Salem, Oregon
Bay Area Plan Exchange............................................................. Coos Bay, Oregon
Eugene Builders Exchange.........................................................Eugene, Oregon
Douglas County Building Exchange......................................... Roseburg. Oregon
Northwest Plan Center.................................................................Seattle, Washington
Northwest Minority Suppliers Assn..........................................Seattle. Washington
One copy may be obtained by prequalified prospective bidders upon receipt of
cash or check in the amount of $50 00 made payable to the Engineer Deposit
made upon procurement of drawings, specifications, and forms of Contract
documents will be refunded upon the return thereof in good condition by actual
bidders within ten (10) days after the opening of bids. Non-bidders deposits will
be refunded only if documents are tetumed, in good condition no later than fif­
teen (16) days after the bid opening. Deposits retained shall cover cost of prin-
ing Individual sheets and specification pages may be purchased for the cost of
reproduction: Drawings: $1.00 per sheet; Specifications, $0.25 per sheet.
Bidders must prequalify with Owner, on Standard Oregon Review Board
Prequalification Forms, ten (10) days prior to bid opening Prequalification forms
may be obtained from the Engineer and should be submitted to the Owner via the
Engineer If a prequalification form is on file with the Engineer and is not over one
year old. refiling is not necessary unless there has been a substantial change in
Contractor's status.
No bid will be considered unless fully completed in the manner provided in the
■Instructions to Bidders" upon the bid form provided by the Engineer and ac­
companied by a bid bond executed in favor of the City of Reedsport in an amount
not less than ten percent (10% ) of the total amount of the bid. Bid bond is to be
forfeited as a fixed and liquidated damage should the bidder neglect or refuse to
enter into a contract and provide suitable bond for the faithful performance of the
work in the event the contract is awarded to him. Funds for the improvement are
available, and monthly payments will be made by check.
No bid will be considered by the City of Reedsport or any officer thereof, unless
the bid contains a statement by the bidder as a part of his bid that the provisions
required by ORS 279.350 shall be included in this Contract. Any bid awarded pur­
suant to this notice will be subject to approval by EPA of the form and content of
the contract between the City of Reedsport and any such successful bidder for
the completion of the construction project
The City of Reedsport reserves the right to reject any and all bids and to waive all
informalities No bidder may withdraw or modify his bid after the hours set for the
opening and thereafter until after the lapse of sixty (60) days from the bid
opening
By order of the City Council of the City of Reedsport.
Jack Green, City Manager
The City of Reedsport reserves the right to reject any and ail bids and to waive all
informalities. No bidder may withdraw or modify his bid after the hour set for the
opening and thereafter until after the lapse of sixty <60I days from the bid
opening
By order of the City Council o* the City of Reedsport.
Jack Greene, City Manager
IN V IT A T IO N TO B ID
The City of Portland encourages bidding by Minority and small business enter
prises and will assist you in understanding and participating in the City's bid
process.
Use the
Pre-Addressed
Envelope
and Peel-Off
Label
For information on the formal bids listed below or City purchasing in general con
tact the Purchasing and Stores Division, Room 113, City Had, 1220 S W 5th
Avenue, Portland, Oregon 97204 or phone 248-4001
Formal Bid Projects presently advertised:
BID NO
DESCRIPTION
BID OPENING DATE
4L___________ Furnishing Hurtrc, Flfrtnr. Turbinas f t Generators--------- 01/ 18/79
Submission Deadline
Concession Privileges at Tennis Center Pro Shop
01 / ‘.6 /7 9
Bid Opening
70
and mail out refund» m lour to five weeks
It can take ten weeks or t -nger for a return
filed in April when the processing workload
is much heavier
Second, taxpayers filing close lo the
deadline are more apt to make mathemati
cal errors due to lack o f time to recheck
calculations on their return Errors slow
down processing, delay refunds and often
require correspondence between IR S and
the taxpayer
Schedule "B " contains work required tor the modification and expansion of
three (3) pump stations.
Schedules " A " and "B " may be awarded to one contractor or separately to
tw o contractors.
Plans and specifications are available only at the office of H .G .E ., Inc., 19 N .W .
Fifth Avenue. Portland, Oregon 97209. and may be seen at the following
locations.
terest of the Owner
Schedule "A " contains work required for the expansion of the Wastewater
Treatment Plant from 0.96 M G D to 1.92 M G D
_________________________________ ________________________ 01223279
80_______________ U tfia im u iO G id S F ^ R i^ in c J in w r A p to t----------- . 0 1 2 1 8 /7 9
______________________ -------------------------------------------------------------------------------------
aa____________N W Front Avwni« Refiontfucbon Part» I & U----------- 01230279
fla
____
RFP
ft TV Sr-ript Writing ft Prorti^tinn________ 01218279
f
Why? Because they
processing your tax
return . . . and
that means a
faster refund
Internal
Revenue
Service