Construction Bids
MAz'IWN A l
NOTICE TO BIDDERS
<....................
.
NOTICE IS HEREBY GIVEN that proposals are invited by the City Council of the
City of Corvallis for construction of the Corvallis Solids Storage Basins, 1977. Sealed
proposals, addressed to the Mayor and City Council, City of Corvallis, Oregon ano
labeled "Proposal for Solids Storage Basina” shall be delivered to the office of the City
Manager. City Hall, Corvallis. Oregon up to but not later than 2:00 pm . Pacific
Daylight Saving time on October 24. 1977. As soon thereafter as practicable, all
proposals «rill be publicly opened and read.
The work includes the furnishing of all labor, materials, and equipment for the
construction and completion of two solids storage basins, a floating pump station, a
tanker loading site, sludge force main, and miscellaneous piping and appurtenances.
Contract documents may be inspected at the office of the Utilities Engineer. City oi
Corvallis, or at the office of Brown and Caldwell, Consulting Engineers, 71 E. 28t I
Ave.. Eugene. Oregon, or at the following: Builders Exchange, 14S E. 29th Ave.,
Eugene; Builders Exchange Co-op, 1125 S.E. Madison. Portland; A.G.C., 1008 N.E
Multnomah. Portland; Builders Exchange, 850 South Van Ness. San Francisco; A.G.C
Plan Room, 1200 Westlake Ave. No., Suite 310. Seattle; Northwest Plan Center, 121)
Valley Street. Seattle; Northwest Contractors Assistance Center. 2112 South Holgate
St. Seattle; Pierce County Minority Contractors Association, 1038 So. Sprague St.
Tacoma; N.W. Minority Contractor's Assoc., 10 N.E. Graham. Portland; Global
Northwest. Inc.. P.O. Box 155. Mercer Island. Wash. Copies may be obtained from the
office of the Corvallis Utilities Engineer or from Brown and Caldwell. Eugene, upon
payment of <10.00 which is NOT refundable.
Every proposal offered must be accompanied by cash, cashier's check or a certifiec
check payable to the order of the City Recorder, or a bidder's bond furnished by a
corporation authorized to issue surety bonds in the State of Oregon, made out in favor
of the City of Corvallis. Said cash, cashier's check, certified cheek or bidder's bond
shall be in an amount not less than ten percent of the lump sum bid. The successful
bidder «rill be required to furnish a performance bond in the sum of one hundred (100)
percent of the contract price. The bond shall be furnished by a company authorized to
issue surety bonds in the State of Oregon; said bond shall be executed by the surety
and contractor before or concurrently with the signing of the contract. Prospective
bidders must prequalify in accordance with State and Local ordinances at least 10 days
.<iar te bid dato; failure to do so will automatically preclude the bid from being
considered.
,
The contract «rill be federally assisted. Each bidder must demonstrate ai
affirmative good faith effort to use Small and Minority Business Enterprises to the
maximum practical extent. To this end. each prospective bidder will receive an
Environmental Protection Agency listing of Small and Minority Business Enterprises
from the Owner so that each bidder may actively and affirmatively solicit bids anc
quotes directly from small and minority contractors for work on the project. In
addition, each bidder shall contact minority enterprises through the minority plan
centers shown above.
Each bidder must agree to be bound by and must bind all subcontractors whose
subcontracts exceed <10.000 by the equal opportunity requirements of Environmenta'
Protection Agency regulations.
The attention of bidders is drawn to labor standard provisions that form a part of
the contract.
Proposals received after the time announced for the opening will not be considered
No bidder may withdraw his bid after the time announced for the opening, or befon
the award and execution of the contract, unless the award is delayed for the period oi
60 days.
The City reserves the right to reject any or all bids, any part of a bid. and to waive
any informality or irregularity in any bid. and to sit and act as the sole judge of thi
m erit and qualifications of the equipment supplied or services offered.
-
ROAD CONSTRUCTION
Bid due October 17. 1977, 2:00 p.m.
Bid « B 81 200 3838 Proj. *885
Sealed proposals will be received at the office of:
Purchasing Director
2506 S.E. 11th Avenue
For Road Construction on N.E. Prescott Street from
N.E. 62nd to N.E. 82nd Avenue
Prequalification Statement is required
Pursuant to the Administrative Rules of Multnomah County Public Contract Review
Board (AR 40.030) prequalification of contractors shall be required for all projects
estimated to cost more than <60,000. Details o f compliance are available from the
County Engineer, Multnomah County Oregon (2nd Floor) 2115 S.E. Morrison Street.
Portland. Oregon 97214. Phone (503) 248 3591.
Non-Discrimination in Employment. Bidders on this work will be required to comply
with the provisions of Federal Executive Order 11246. The requirements for Bidders
and Contractors are explained in the Specifications.
Specifications are filed with the Clerk of the Board of County Commissioners and
copies may be obtained at Office of County Engineers, 2115 S.E. Morrison Street (2nd
Floor) for a <5.00 non refundable fee.
No bid will be received or considered unless the bid contains a statement by the bidder
as part of hi3 bid that the requirements of section (4) 279.350 279.352, 279.354, 279.355,
279.358 shall be met.
All bidders are notified that they must agree to extend at least 10% of the contract for
bona fide Minority Business Enterprises.
No proposal will be considered unless accompanied by a check payable to Multnomah
County, certified by a responsible bank, or in lieu thereof, a surety bond for an amount
equal to ten percent of the aggregate proposal. The successful bidder shall furnish a
bond satisfactory to the Board in the full amount of the contract.
Multnomah County reserves the right to reject any or all bids.
Richard W. Tydeman, Purchasing Director
MULTNOMAH COUNTY, OREGON
MULTNOMAH COUNTY
STORM DRAIN CONSTRUCTION
Bids due October 17, 1977, 2:00 p.m.
Bid N B 61 200 3837
Sealed proposals will be received at the office of:
Purchasing Director
2505 S.E. 11th Avenue
For Construction of Storm Drain on N.E. 162nd Avenue
from N.E. Halsey Street to N.E. Sandy Blvd.
Prequalification Statement is required
Pursuant to the Administrative Rules of Multnomah County Public Contract Review
Board (AR 40.030) prequalification of contractors shall be required for all projects
estimated to cost more than <50,000. Details of compliance are available from the
County Engineer, Multnomah County Oregon (2nd Floor), 2115 S.E. Morrison Street,
Portland, Oregon 97214. Phone (503) 248-3591.
Non-Discrimination in Employment. Bidders on this work will be required to comply
with the provisions of Federal Executive Order 11246. The requirements for Bidders
and Contractors are explained in the Specifications.
Specifications are filed with the Clerk of the Board of County Commissioners and
copies may be obtained at:Office of County Engineers, 2115 S.E. Morrison Street (2nd
Floor), for a <5.00 non-refundable fee.
,
• - > •?.• Uvr- . ..i
No bids will be received or considered unless the bid contains statement by the bidder
as part of his bid that the requirements of section (4) 279.350, 279.352, 279.354,
279.356, 279.356 shall be met.
All bidders are notified that they must agree to extend at least 10 percent of the
contract for bona fide Minority Business Enterprises.
Dated: September 29. 1977
Jerry A. Hortsch
City Recorder of the City of Corvallis
MULTNOMAH COUNTY
-
'ftlùuwù/ '&UÌMU
No proposal «rill be considered unless accompanied by a check payable to Multnomah
County, certified by a responsible bank, or in lieu thereof, a surety bond for an amount
equal to ten percent of the aggregate proposal. The successful bidder shall furnish a
bond satisfactory to the Board in the full amount of the contract.
DEPARTMENT OF GENERAL SERVICES
PURCHASING DIVISION
122» FERRY 8T-, 8 X . SALEM, OREGON
“An Equal OppertoeMy EaapUysr”
Multnomah County reserves the right to reject any or all bids.
Richard W. Tydeman, Purchasing Director
MULTNOMAH COUNTY. OREGON
ADVERTISEMENT FOR BIDS
Sealed bids «rill be received by the undersigned at the Department of General Services,
IMS Ferry St.. S.E., Salem. Oregon 97S10, for various acquisitions as detailed herein.
Bid invitations, sperifwations and applicable forms of contract documents may be seen
or obtained at the aforementioned office.
will he opened and publicly read aloud at the time stated. Bids received after the
time fixed lor opening «rill not be considered.
MULTNOMAH COUNTY
ROAD CONSTRUCTION
hu .
Bids for commodities and services, and public improvements under <60,000 DO NOT
require prequalification of bidders nor is it desired. Bidders wishing to prequalify must
submit request ten days prior to bid opening date.
COMMODITIES AND SERVICES
BMNe.
11-8478-77
Fabricate Cabinets
Opening Date
10-28-77
Corvallis
Department of General Services
Purchasing Division
Ralph Calkin
Purchasing Agent
Bids due October 24, 1977, 2:00 p.m.
Bid « B 61 200-3847 Proj. * 888
Sealed proposals will be received at the:
Purchasing Section
2606 S.E. U th Avenue. Portland 97202
For: Road Construction on N.E. Columbia Blvd. from N.E. 82nd to N.E. 52nd Avenue.
Prequalification Statement is required.
Pursuaf»* to the Administrative Rules of Multnomah County Public Contract Review
Posrd (AR 40.030) prequalification of contractors shall be required for all projects
estimated to cost more than <50,000. Details of compliance are available from the
County Engineer, Multnomah County, Oregon (2nd Floor) 2116 S.E. Morrison Street,
Portland, Oregon 97214. Phone (503) 248 3591.
Non-Discrimination in Employment. Bidders on this work will be required to comply
«rith the provisions of Federal Executive Order 11246. The requirements for Bidders
and Contractors are explained in the Specifications.
Specifications are filed with the Clerk of the Board of County Commissioners and copies
may be obtained atOffice of County Engineers, 2115 S.E. Morrison Street (2nd Floor)
for a <6.00 non-refundable fee.
NOTICE TO CONTRACTORS
TOWN OF CUSICK. CUSICK, W A.
Sealed bids for the construction of an interceptor between Usk and Cusick and additions
to existing lagoon and sprinkling system will be received at the Town Hall. Cusick,
Washington until 7:00 p.m. Pacific Standard Time November 1, 1977 and then at said
office publicly opened and read aloud. The Contract Documents may be examined at the
following locations:
Associated General Contractors, E. 4936 Trent Avenue. Spokane, WA. 99208; Spokane
Construction Council, E. 102 Boone Avenue. Spokane, WA. 99202; James A. Sewell &
Associates. 418 W. 3rd Avenue, Newport, WA. 99168; Tucker Engineering Consultants.
107 - 6th Avenue, Sandpoint. ID. 83884.
the Contract Documents may be obtained at the office of James A. 8ewell &
located at 418 W. 3rd, Nesrport. Washington or Tucker Engineering
Consultants, 107 - 6th Avenue. Sandpoint. Idaho 93984 upon payment of <40.00 for each
set Bonafide bidders will be refunded thia payment upon returning the documents and
any non-bidder will be refunded <16.00 if Contract Documents are returned within l n
All bidders are notified that they must agree to extend at least 10% of the contract for
bonafide Minority Business Enterprises.
No bid will be received or considered unless the bid contains a statement by the bidder
as part of his bid that the requirements of Section (4) 279.350, 279352,279.354,279.355 &
279.368 shall be met.
No proposal will be considered unless accompanied by a check payable to Multnomah
County, certified by a responsible bank, or in lieu thereof, a surety bond for an amount
equal to ten percent of the agregate proposal. The successful bidder shall furnish a bond
satisfactory to the Board in the full amount of the contract.
Thursday, October 13, 1977 Page
NOTICE TO CONTRACTORS
WASTEWATER COLLECTION AND TREATMENT IMPROVEMENTS
CITY OF WAPATO
BID OPENING: November 15. 1977
Sealed bids will be received by the City Clerk, City of Wapato, City Hall, 205 East Third
Street, Wapato. Washington 9896) until 200 o'clock p.m., on November 15, 1977, for the
construction of Wastewater Collection and Treatment Improvements
Schedule A:
Wastewater Treatment Facilities. Bids received after that time will not be considered
Sealed bids «rill be opened and publicly read aloud at the time and dates stated.
The work includes all labor, materials, and equipment for the construction of
modifications to tlw existing City of Wapato Sewage Treatment Plant to provide
secondary treatment for an average design flow of 1.10 MGD.
Plans and specifications have been prepared and are available at the offices of Gray &
Osborne, Inc., P.S.. 803 West “A” 8treet, P.O. Box 2795, Yakima. Washington 98902;
Telephone:l-509-463-4833. Plans and specifications «rill be issued upon payment of a
non refundable charge-of <60.00.
Bidders requesting plans and specifications should identify themselves as general
contractors or subcontractors.
Each bid shall be accompanied by a bid bond, certified check, or cashier's check made
payable to the City of Wapato, in an amount not less than five percent of the amount of
the bid. The bid bond or cheek shall be given as a guarantee that the bidder will execute
the contract in conformity «rith the contract documents if it is awarded to him.
The project is financed in part by state and federal funds and bidders must meet all
requirements of appropriate state and federal agencies as included in the specifications.
Attention of bidders is particularly called to the requirements as to nondiscrimination in
employment and minimum wage rates to be paid under this contract.
The City reserves the right to reject any or all bids and to waive minor informalities.
The contract shall be awarded to the lowest, responsive, responsible bidder, in
accordance «rith requirements of the U.S. Environmental Protection Agency.
No bidder may withdraw his bid after the hour set for the opening thereof or before
award of contract, unless said award is delayed for a period exceeding sixty days.
Sealed envelopes containing the proposal shall be marked "WAPATO WASTEWATER
COLLECTION AND TREATMENT IMPROVEMENTS SCHEDULE “A”: WASTE-
WATER TREATMENT", and addressed to the City Clerk, City Hall, 206 East Third
Street, Wapato, Washington 96951.
(Signed) Irene McAuliffe
City Clerk
ADVERTISEMENT FOR BIDS
City of Hagerman, 218 Main Street, Hagerman, Idaho 83332
Seperate sealed BIDS for the construction of a sewage collection system and
treatment works «rill be received by The City of Hagerman at the office of the City
Clerk in the City Hall until 2 j OO o’clock p.m. Standard Time, November 2,1977, and then
at said office publicly opened and read aloud.
The CONTRACT DOCUMENTS may be examined at the Office of the City Clerk,
City Hall, 218 Main Street, Hagerman, Idaho.
Copies of the CONTRACT DOCUMENTS may be obtained at the office of The City
Clerk, City Hall, 218 Main Street, Hagerman. Idaho upon payment of <30.00 for each set.
Any BIDDER, upon returning the CONTRACT DOCUMENTS promptly and in good
condition, «rill be refunded his payment, and any non-bidder upon so returning the
CONTRACT DOCUMENTS «rill be refunded 130.00.
I
Dean Holt,
Mayor
ADVERTISEMENT FOR BIDS
FOR CONSTRUCTION OF
WASTEWATER TREATMENT FACILITY
INTERCEPTOR AND COLLECTOR SEWERS
FOR THE COLVILLE FEDERATED TRIBES,
NESPELEM, WASHINGTON
Sealed proposals «rill be received at the Colville Indian Agency. Nespelem, Washington
up to 1:30 o’clock p.m. on the 28th day of October, 1977 for the construction of a
wastewater treatment facility, four lift stations, gravity and force main interceptor
sewers, and collector sewers for the Colville Confederated Tribes, Nespelem.
Washington. Immediately thereafter said proposals will be publicly opened and read. A
contract «rill be awarded or bids «rill be rejected within forty-five (45) days after date of
opening.
The work includes the furnishing of all laucr, material, and equipment necessary for the
construction of the wastewater treatment facility, four submersible lift stations and
approximately 12,350 L.F. of four-inch force main, 3,270 L.F. of six-inch force main,
9,300 L.F. of eight-inch interceptor sewers, 1,100 L.F. of 4-inch side sewers, house
connections, and all appurtenances.
Specifications may be examined at the Colville Indian Agency, Nespelem. Washington,
or at the offices of Stevens, Thompson, & Runyan, Inc., Engineers/Planners, Suite 700,
P l««« 600, Seattle, Washington 98101, or 5506 S.E. Milwaukie Avenue, Portland,
Oregon 97202.
Copies of said plans and specifications may be obtained upon application at the office of
the Engineers/Planners, Stevens, Thompson & Runyan, Inc., 700 Plaza 600, Seattle,
Washington. 98101, upon payment of a deposit of <60.00 in cash or cashier's check which
«rill be refunded upon return of the documents in good condition within fifteen (15) days
after bid opening. If the drawings and/or specifications are damaged so as to preclude
their further use, or if they are not returned «rithin the 15-d«y period, a charge of <30.00
«rill be retained from the refund. All refunds «rill be made approximately thirty (30)
days after bid opening.
All proposals must be submitted on the regular forms furnished with the specifications
and each must be accompanied by a certified check, cashier’s check or bid bond in an
amount not less than five percent (5%) of the total bid. A corporate surety bond in the
full amount of the contract «rill be required to guarantee its faithful performance.
Attention is called to the fact that not less than the minimum salaries and wages as set
forth in the contract documents must be paid on this project, and that the contractor
must ensure that employees and applicants for employment are not discriminated
against because of their race, color, religion, sex, or national origin.
The Colville Confederated Tribes reserves the right, before or after opening to reject
any or all proposals or to waive any informalities therein if it is believed that the best
interest of the Tribe will be served thereby.
BY ORDER OF THE COLVILLE
CONFEDERATED TRIBES
NESPELEM, WASHINGTON 99156
Multnomah County reserves the right to reject any or all bids.
Richard W. Tydeman, Purchasing Director
MULTNOMAH COUNTY, OREGON
TOWN OF CUSICK
James A. Sewell, Engineer
SUB-BIDS REQUESTED
Eliot II
80 units of elderly housing.
Housing Authority of Portland
Walsh Construction Company
2839 S.W. 2nd Avenue, Phone:222-4375
Plans available at ¡United Minority Workers, Northwest Minority Contractors. Contract
Management Association, and Walsh Construction.
Support Minority Business Enterprise
We are an Equal O?;<erteeRy Eaa;4eyec and request bids from minority sub-contractors
in all trades.