Image provided by: University of Oregon Libraries; Eugene, OR
About Illinois Valley news. (Cave City, Oregon) 1937-current | View Entire Issue (Aug. 10, 2022)
YOUR FAMILY. YOUR FRIENDS. YOUR NEWS. Illinois Valley News Wednesday, August 10, 2022, 1 Section, Volume LXXXV No. 31 $1.00 Published Weekly for the residents of the Illinois Valley Judge rules Junction Inn fees due CJ Schatza IVN copy editor The fate of the property that once hosted the sole motel in the city of Cave Junction will be decided in the coming weeks as a judge is set to hand down a judgment ordering the property’s owner to pay a fine or surrender the property to the city. The Junction Inn, located at 406 S Redwood Hwy, was declared a nuisance by the city Feb. 25, 2020. Given 10 days to resolve the nuisance, the property owners began to be fined $500 per day starting March 6 of that year because Junction Inn was not returned to compliance. The motel’s owner, Lojerky Inc., a California corporation, was informed in a letter the property had been declared a nuisance for a multitude of reasons, including: stress in portions of the structure due to high loads; weakened or unstable structural members or appendages; buckled or leaning walls; chronic dereliction. The city of Cave Junction defines derelict buildings as the following: “For purposes of this code, a derelict building shall be defined as any building or structure which is unoccupied and boarded, and/or which is unoccupied and unsecured, and/or which is occupied unlawfully without a valid lease and/or the express consent of the owner. If the person responsible for a derelict building fails to correct the conditions which cause a building to be a derelict building within the frames set forth herein, the derelict building shall be declared a nuisance.” According to an order for summary judgment submitted by attorney Patrick Kelly, who is representing the city, which is the plaintiff in this case, “The court, having reviewed the respective filings of the parties, and being fully advised, it is ordered and adjourned, that Plaintiff’s request via its motion for summary judgment, in its suit for civil enforcement of city nuisance, is hereby granted.” Circuit Court Judge Pat Wolke’s signature was included in the document. In addition to the request that Lojerky be held in violation of Cave Junction municipal code by the circuit court, be required to correct said violation and pay $500 per day from March 6, 2020, Kelly also requested on behalf of the city that the Junction Inn owner be liable for “all reasonable attorney’s fees, costs and disbursements incurred by the city for the enforcement of this ordinance.” (Photo courtesy of Roger Brandt for the Illinois Valley News) Cutting some Art Artist Joey Wallace, chainsaw carver, was at work on benches Tuesday, Aug. 2 at the Illinois River Forks State Park. The benches will be placed along the expanded path at Rough and Ready Botanical Area, The purpose of these benches is to give older visitors and people with mobility limitations a place to sit and rest before continuing on the path to enjoy some of the more pristine parts of this unique area. 2 Valley grows shut down JOSEPHINE COUNTY, Ore. – Over 1,000 illegal marijuana plants were found during a drug bust in Josephine County. Oregon State Police said on Aug. 2, its drug enforcement team served a search warrant at a marijuana grow operation in the 1500 block of Lone Mountain Road near O’Brien. Investigators reportedly found 1,773 illegal marijuana plants in seven large greenhouses. They also found about 1,000 pounds of processed marijuana buds packaged for sale. According to OSP troopers, the property owner may be liable for numerous code violations regarding solid waste, unpermitted structures, and unpermitted electrical installations. Police did not mention if any arrests were made. The investigation is ongoing. On Aug. 4, 2022 the Josephine Marijuana Enforcement Team with the assistance of Josephine County Code Enforcement executed a search warrant in the 5000 block of Reeves Creek, Selma regarding an illegal marijuana grow site. During the execution of the warrant, 145 growing marijuana plants and approximately 200 pounds of processed marijuana was seized and destroyed. In addition to the marijuana plants and processed marijuana, multiple firearms were seized. Although the size of this grow operation was not large in comparison to others we have seen this year, it was well beyond the legal limit of 4 plants allowed per Oregon State Law. JMET always leaves 4 legal marijuana plants when we dismantle each grow operation. The property also had multiple electrical and solid waste code violations. These violations could result in the civil forfeiture of the property. Patrick Timothy Cross was taken into custody and lodged at the Josephine County Jail for unlawful manufacturing of marijuana and unlawful possession of marijuana. At the time of this press release the investigation is ongoing and no further details are being released. (Courtesy photo for the Illinois Valley News) 200 pounds of processed cannabis on the ground Thursday, Aug. 4 at Reeves Creek in Selma. Biscuit Fire Anniversary Biscuit Fire – Originally ran in Aug. 7, 2002 edition of the Illinois Valley News Fire dragon starts to run, but danger lurks: I.V. blesses, thanks firefighters by Sherri Hopper A week after the Tuesday, July 30 public meeting during which fire officials stood before residents of Illinois Valley and requested that they voluntarily evacuate, things have steadily progressed to a calmer situation. Finally receiving a break in the weather pattern that calmed the winds and lowered temperatures for several days, the fire growth slowed. As of Monday, Aug. 5 at 6 p.m. the entire fire was “upped” to a four hour pre- evacuation notice. It had been 30 minute since Tuesday, July 30. Meanwhile, bulldozers and fire crews worked continuously to construct a fire line along the eastern side of the fire, with backburn operations occurring throughout the week. As of Tuesday, Aug. 6, fire crews were working along the northeast flank of the Florence Fire, continuing to prepare fire line from Hanson Saddle to Soldier Camp. From Sam Brown Campground to the area of fire line west of O’Brien, firefighters will be patrolling fire line and mopping up. In the area south of O’Brien, fire line construction continued. SEE BISCUIT ON A-9