Happy Bir thday to Bobbi Lyn
Rodriguez, #1 Mom of the Year! We love
you so much now and forever.
A z ly n a n d Fre d e Ro d r i g u e z
(smooches)
Happy 22 nd Birthday, Dreonna! We’re
so proud of you and love you so very much!
Love, Mom and Dad
Happy 20 th Birthday to our Princess
Savannah Rae Worman. We love you very
much.
Mom, Chad, Hayden, Booboo,
Grandma D and Papa
Happy 5 th Birthday to my beautiful
granddaughter, Zakhara. Hope you have
the best birthday ever! Love, hugs and
kisses, baby girl.
Love, Nana, Papa and your aunties
Bianca, Vanessa, Isabella and Chloe
Little Miss Siletz
Halli Lane-Skauge
(right) rides in
the Pi-Ume-Sha
parade on June 25
with Miss Warm
Springs Keeyana
Yellowman.
Most Often
Requested Numbers
Confederated Tribes of Siletz Indians –
800-922-1399
Salem Area Office – 503-390-9494
Salem Finance Office –
888-870-9051
Portland Area Office –
503-238-1512
Happy Birthday, Chris! Hope you have
an awesome birthday.
Love, Aunt Laurie, Pedro, Bianca,
Vanessa, Isabella, Chloe and all your
family and friends
Eugene Area Office – 541-484-4234
Contract Health Services (CHS) –
800-628-5720
Siletz Community Health Clinic –
800-648-0449
Siletz Behavioral Health –
800-600-5599
U.S. 20 construction closes road at Sheep Creek Bridge
SWEET HOME, Ore. – From Aug.
2 through the end of September, U.S. 20
will be closed at Sheep Creek Bridge for
repairs to the bridge and abutments.
Located 26 miles east of Sweet Home,
milepost 56.6, the bridge’s eastern abut-
ment rests on an active slide with earth
movement measured at 6-7 inches a year.
The bridge was built to move with the
slide, but has reached the point that it must
be replaced.
In 2015 during phase one of the
two-part project, 50-foot steel piles were
placed to redirect landslide activity away
from the bridge. Phase two is intended to
stabilize the existing structure and elimi-
nate further sliding.
The new bridge span and abutment
will be built to ride on top of the slide if
it keeps moving. This will make impact
to the bridge more consistent and predict-
able, and therefore, more manageable.
Full closure of the highway will last
for 6-8 weeks. The road will remain open
between Sweet Home and the bridge on
the west side and from Santiam Junction
to the bridge from the east. Campgrounds
and recreation areas will continue to be
open and accessible.
Detour signs will be posted at various
locations to direct travelers around the area
via Highways 34, 22 and 126. There are
no local detours.
20
•
Siletz News
•
Logan Road RV Park
This beautiful RV park has a free
shuttle to Chinook Winds. Visit logan-
roadrvpark.com or call 877-LOGANRV.
August 2016
Chemawa Health Clinic –
800-452-7823
Bureau of Indian Affairs –
800-323-8517
Website – ctsi.nsn.us
The road closure will be completed
by the end of September. Construction
work surrounding the bridge, however, will
continue through October.
Passages Policy
For more information, including
a detour map and videos on the proj-
ect, visit oregon.gov/ODOT/HWY/
REGION2/Pages/US-20-Sheep-Creek-
Bridge-Phases-1-and-2--.aspx
Submissions to Passages are lim-
ited to two 25-word items per person,
plus one photo if desired. All birthday,
anniversary and holiday wishes will
appear in the Passages section.
Know Before You Go – For the latest road conditions, visit TripCheck.com.
Tribal RV parks
have space available
for you
Chinook Winds Casino Resort –
888-244-6665
Hee Hee Illahee RV Resort
This beautiful five-star RV resort
is located in Salem. Visit heeheeilla-
hee.com or call 877-564-7295.
Siletz News reserves the right to
edit any submission for clarity and
length. Not all submissions are guar-
anteed publication upon submission.
Please type or write legibly and
submit via e-mail when possible.