Deconstruction to Demolition – The Process
By Jamie Jones
Housing Rehabilitation and Demoli-
tions Specialist
Community Action Team, Inc
will also go to the metal bins.  Depend-
ing  on  what  type  of  siding  is  on  the 
home,  residents  have  asked  to  salvage 
the siding; however, not all siding is re-
cyclable.    If  the  siding  has  lead-based 
paint,  it  must  be  removed  in  a  specific 
manner and sent to Waste Management, 
where  they  will  dispose  of  it  properly. 
 
Next,  all  the  roofing  materi-
als  are  removed.    Most  roofs,  so  far, 
have  been  composite  shingles.    This 
material  is  recycled  at  the  contrac-
tor’s  yard,  sorted  to  remove  nails,  then 
ground  up  and  blended  with  concrete.  
Metal  roofs  will  be  salvaged  through 
Metro Metals.  Wood roofs will go into 
the  wood  reserve  on  the  mill  site  pad. 
 
When  the  structure  is  down  to 
the  wood  studs,  the  demolition  starts.  
Custom  Excavating  tries  to  knock  the 
structure  down  in  a  way  that  allows 
most  beams  to  be  preserved.    All  the 
wood not salvaged off the property site 
is  taken  over  to  the  mill  site,  where  it 
will be available for salvage until a later 
date.    Pressure-treated  wood  is  being 
set aside for the Skills Park.  Any wood 
that  is  not  salvaged 
from  the  mill  site 
will be ground down 
to  make  hog  fuel  for 
the  GP  Wauna  Mill.  
The grinder pulls out 
all the nails and a bin 
catches them so they, 
too,  can  be  recycled. 
 
Finally, 
the 
structure  is  down  to 
the  subfloor.    The 
wood,  metal,  plas-
tic  and  insulation 
items  are  disposed 
of  as  described  ear-
lier.  While removing 
concrete, the primary 
waste pipe is located, 
capped and signed off 
as complete by Vernonia Public Works.  
come home to many small critters.
 
As  they  work  on  the  walls  and  The  concrete  and  asphalt  are  broken 
studs, all metals – 
copper,  iron,  alu-
minum, sheet met-
al,  and  wire  –  are 
sorted  into  bins 
supplied by Metro 
Metals.    Plastic-
type  piping  –  wa-
ter,  waste  and 
drain  –  go  in  the 
bin  and  are  split 
between  Custom 
Excavating  and 
Waste  Manage-
ment.  Any carpet 
remaining  on  the 
ground  floor  will 
be  thrown  away.  
U n f o r t u n a t e l y, 
so  far,  no  carpet 
found  on  the  second  floor  has  been  in 
good enough shape to reuse.  Anything 
that can be reused will be available for 
a small cost and/or donated to local resi-
dents.    These  items  include:    windows 
and doors, wood floors and paneling, ap-
pliances, cabinets, ceiling fans, brick/tile 
veneers, fireplace mantels, and sinks.
 
Once the inside has been gutted, 
the contractor will remove the windows 
and doors on the first level.  Second-level 
windows are also available if requested 
ahead of time.  Windows and doors have 
been made available to the public at no 
cost.    If  unclaimed,  the  vinyl  windows 
are thrown away, vinyl is not recyclable.  
The  metal  from  the  windows  will  go 
into the metal bins and the wood to the 
wood  pile.   Any  hardware  not  claimed 
bin, is taken back to the contractor’s yard 
and sorted for nails.  The nails are later 
combined with the other metals and the 
sheetrock will be blended with recycled 
concrete.  Insulation is removed and put 
 
When  someone  says  “Demos,”  in a separate bin.  Sometimes insulation 
my  first  thought  is  a  building  being  can be recycled, but most of these build-
imploded  from  the  inside  out.    The  re- ings have been sitting since the flood, so 
search  I’ve  done  on  flooded  properties  the insulation is dirty, moldy and has be-
elsewhere  showed  homes 
being  knocked  over  with  a 
wrecking ball or an excava-
tor,  while  a  truck  sprayed 
water to keep the dust down 
during  the  entire  project.  
I  was  a  bit  disheartened 
with  the  process.    Thank-
fully, to Custom Excavating 
and  Trails  End  Recovery, 
“demo”  means  deconstruc-
tion  and  recovery  of  mate-
rials.    So  one  might  won-
der,  what  is  involved  in 
deconstructing  a  building? 
 
Once you enter into 
this  type  of  contract,  the 
first  step  is  to  get  the  per-
mits.    Many  people  think 
that a permit is unnecessary 
but, yes, you do need a building permit 
to  tear  a  house  down--  for  some  very 
good reasons.  Most people don’t realize 
that permits are protection for the owner 
and the contractor, and are important in 
removing  a  building.    This  is  particu-
larly  true  with  the  utilities  serving  the 
building.    All  utilities  must  be  discon-
nected  from  the  property  before  work-
ing  on  the building.  Also required is  a 
flood plain permit.  Our flood ordinance 
requires  that  the  city  review  anything 
built  or  demolished  in  the  floodplain. 
 
The homes to be demolished are 
also tested for lead and asbestos.  While 
this  is  usually  a  must  in  older  homes, 
we’re  required  by  our  grant  funders  to 
make  sure  this  is  done.    One  example 
illustrating  why  this  is  required  is  the 
house  that  was  painted  with  lead-based 
paint within the last ten years, 30 years 
after  it  was  banned.    Many  of  these 
older  homes  also  have  asbestos  ceil-
ings and asbestos tiles.  The hazards in 
these homes are mitigated separately by 
a  trained  asbestos  removal  team  before 
the contractor can remove anything.
 
During  this  time,  the  various 
utility  companies  are  also  contacted.  
WOEC  cuts  the  lines  at  the  boxes,  be-
low ground or at the weatherheads, and 
then removes the meters.  Public Works 
caps  the  water  pipes  and  removes  the 
meter.  The gas company caps their line 
at  the  main  junction  and  at  the  struc-
ture  before  the  meter  is  removed.    At 
this  point,  the  contractor  can  pull  up 
any  pipes  that  are  still  in  the  ground. 
 
Now  that  it’s  safe  to  knock 
things  around,  the  contractor  tears  out 
the  sheetrock.    This  goes  in  a  separate 
february22
2011
19
down into smaller pieces to be taken to 
the mill site, where they are sorted, bro-
ken down further and prepared for crush-
ing.  When sufficient material has been 
accumulated,  a  crusher  will  be  brought 
in  to  crush  the  concrete.    If  taken  back 
to  the  contractor’s  yard,  the  concrete 
will  also  be  blended  with  the  shingles 
and  drywall.    The  crusher  also  sorts 
out  nails  and  rebar  for  Metro  Metals. 
 
Depending  on  the  depth  of  the 
home’s foundation, what remains is a 1-3 
foot depression where the structure was 
located.   This  depression  will  be  filled, 
leveled and seeded with grass during the 
spring months.  Local, clean fill will be 
used whenever possible and taken from 
other locations within the floodplain. 
 
Custom 
Excavating 
has 
been  offering  recycling  and  recovery 
services  for  ten  years  and  has  built  a 
solid  reputation  in  reducing  landfill 
waste.  It is clear that the company and 
its  employees  care  about  what  they  are 
doing and how they leave the site.  They 
seem committed to getting a site as clean 
as possible before moving on to the next 
project.    They’ve  invested  time  in  our 
community  and  have  been  giving  back 
by allowing people to have many of the 
salvageable items at little or no cost.  If 
you’d like additional information about 
them,  visit  their  website  at  http://www.
trailsendrecovery.com/Home.html.
 
While  the  demolition  is  a 
fascinating  process  to  watch,  it’s  also 
sad  to  see  some  of  our  older  homes 
disappearing.    On  the  upside,  we’re 
gradually  clearing  the  flood  plain  to 
make our town more resilient and at the 
same time creating some awesome park 
space for the next Friendship Jamboree.  
There’ll be many new places to sit and 
enjoy  a  meal,  beverage  and  the  view. 
 
Remember,  our  contract  with 
the  demolition  contractor  gives  all 
salvage  rights  to  Custom  Excavation.  
That  means  the  salvage  value  of 
each  component  of  the 
property  belongs  to  them.  
Taking  anything  from  one 
of  the  properties  to  be 
demolished is theft.  Those 
interested  in  obtaining 
salvaged  components  must 
contact  the  contractor 
for  permission  and  sign 
a  release  before  taking 
anything  off  the  property.  
If you have questions about 
the  deconstruction/demos, 
call  Alex  Raichl,  Custom 
Excavating  at  (503)  741-
6867,  or  Jamie  Jones  at 
CAT, Inc., (503) 429-4948.